<?xml version="1.0" encoding="utf-8"?><rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom"><channel><title>Board of Commissioners of Cook County - Meeting of Roads and Bridges Committee (Inactive.  There is now a Transportation Committee) on 9/26/2018 at 10:00 AM</title><link>https://cook-county.legistar.com/Gateway.aspx?M=CalendarDetail&amp;From=RSS&amp;ID=678393&amp;GUID=77BC89D1-C3BA-431E-8C26-5D3062114A5B</link><description /><generator>Legistar</generator><ttl>15</ttl><atom:link href="https://cook-county.legistar.com/Feed.ashx?GUID=77BC89D1-C3BA-431E-8C26-5D3062114A5B&amp;ID=678393&amp;M=CalendarDetail" rel="self" type="application/atom+xml" /><item><title>18-6023</title><link>https://cook-county.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=3680953&amp;GUID=DB938A47-B78F-40DA-8937-D2C4B152EAE5</link><guid isPermaLink="false">DB938A47-B78F-40DA-8937-D2C4B152EAE5-2019-02-05-19-33-42</guid><description>File #: 18-6023&lt;br /&gt;Ver.: 2&lt;br /&gt;Agenda #: &lt;br /&gt;Type: Committee Minutes&lt;br /&gt;Title: COMMITTEE MINUTES

Approval of the minutes from the meeting of 09/12/2018&lt;br /&gt;Action: approve&lt;br /&gt;Result: Pass</description><category>Committee Minutes</category><pubDate>Tue, 05 Feb 2019 19:33:42 GMT</pubDate></item><item><title>18-4768</title><link>https://cook-county.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=3583152&amp;GUID=35ECD21B-9469-4CDE-B1A3-5C2140A8AFC1</link><guid isPermaLink="false">35ECD21B-9469-4CDE-B1A3-5C2140A8AFC1-2019-02-05-19-33-42</guid><description>File #: 18-4768&lt;br /&gt;Ver.: 1&lt;br /&gt;Agenda #: &lt;br /&gt;Type: Change in Plans and Extra Work (Highway)&lt;br /&gt;Title: PROPOSED CHANGE IN PLANS AND EXTRA WORK (TRANSPORTATION AND HIGHWAYS)

Department: Transportation and Highways

Other Part(ies):  G &amp; V Construction, Inc., Bensenville, Illinois

Action:  Refer to Roads and Bridges Committee - Proposed Change in Plans and Extra Work

Section:  08-B5934-04-RP

Contract Number(s): 12-28-016

IDOT Contract Number(s): 10218

Federal Project Number(s): M-9003(742)

Federal Job Number(s): C-91-187-11

Location:  170th (167th) Street - South Park Avenue to Bishop Ford Freeway

Board District:  6 

Good(s) or Service(s):  The improvement consisted of concrete pavement reconstruction, combination concrete curb and gutter, an enclosed drainage system, pavement removal, earth excavation, street lighting, traffic signal installations, pavement markings and signage, pedestrian and bicycle accommodations, landscaping, erosion control, traffic control and protection, and other related work to complete the project.   

Fiscal Impact:  $7,835.00 (increase)  

Accounts:  11566.1500.29150.560019

Summary:  The Department of Transportation an&lt;br /&gt;Action: recommend for approval&lt;br /&gt;Result: Pass</description><category>Change in Plans and Extra Work (Highway)</category><pubDate>Tue, 05 Feb 2019 19:33:42 GMT</pubDate></item><item><title>18-4769</title><link>https://cook-county.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=3583153&amp;GUID=CF07F0D0-5501-4D95-9BB2-FC67764B0B88</link><guid isPermaLink="false">CF07F0D0-5501-4D95-9BB2-FC67764B0B88-2019-02-05-19-33-42</guid><description>File #: 18-4769&lt;br /&gt;Ver.: 1&lt;br /&gt;Agenda #: &lt;br /&gt;Type: Change in Plans and Extra Work (Highway)&lt;br /&gt;Title: PROPOSED CHANGE IN PLANS AND EXTRA WORK (TRANSPORTATION AND HIGHWAYS)

Department: Transportation and Highways

Other Part(ies):  D. Construction, Incorporated, Coal City, Illinois

Action:  Refer to Roads and Bridges Committee - Proposed Change in Plans and Extra Work

Section:  13-PREPS-01-RS

Contract Number(s): 1428-13429

IDOT Contract Number(s): N/A

Federal Project Number(s): N/A

Federal Job Number(s): N/A

Location:  
Pavement Resurfacing Enhancement Program - South 2014
Cottage Grove Avenue - Lincoln Highway to Glenwood-Lansing Road
Kedzie Avenue - 158th Street to 155th Street
Steger Road - Harlem Avenue to Cicero Avenue
139th Street - Coopers Grove Road to Harrison Avenue

Board District:  5 and 6

Good(s) or Service(s):  The improvement consists of furnishing all labor, materials and equipment required for Pavement Resurfacing Enhancement Program - South 2014.  This includes but is not limited to hot-mix asphalt surface removal, hot-mix asphalt resurfacing, frame and lid adjustments, guardrail upgrades and maintenance, sidewalk removal and ADA c&lt;br /&gt;Action: recommend for approval&lt;br /&gt;Result: Pass</description><category>Change in Plans and Extra Work (Highway)</category><pubDate>Tue, 05 Feb 2019 19:33:42 GMT</pubDate></item></channel></rss>