<?xml version="1.0" encoding="utf-8"?><rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom"><channel><title>Board of Commissioners of Cook County - Meeting of Roads and Bridges Committee (Inactive.  There is now a Transportation Committee) on 2/10/2015 at 10:00 AM</title><link>https://cook-county.legistar.com/Gateway.aspx?M=CalendarDetail&amp;From=RSS&amp;ID=678227&amp;GUID=84639FF6-23D4-4799-A32F-1FC79914129E</link><description /><generator>Legistar</generator><ttl>15</ttl><atom:link href="https://cook-county.legistar.com/Feed.ashx?GUID=84639FF6-23D4-4799-A32F-1FC79914129E&amp;ID=678227&amp;M=CalendarDetail" rel="self" type="application/atom+xml" /><item><title>15-1550</title><link>https://cook-county.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=2162366&amp;GUID=06BFF897-4EDD-45C8-B8D7-9D283FEF755E</link><guid isPermaLink="false">06BFF897-4EDD-45C8-B8D7-9D283FEF755E-2020-11-20-01-24-45</guid><description>File #: 15-1550&lt;br /&gt;Ver.: 1&lt;br /&gt;Agenda #: &lt;br /&gt;Type: Committee Minutes&lt;br /&gt;Title: COMMITTEE MINUTES

Approval of the minutes from the meeting of 1/21/2015&lt;br /&gt;Action: recommend for approval&lt;br /&gt;Result: Pass</description><category>Committee Minutes</category><pubDate>Fri, 20 Nov 2020 01:24:45 GMT</pubDate></item><item><title>15-1039</title><link>https://cook-county.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=2129067&amp;GUID=EE9A1EDE-C42F-4D6E-ADBF-307BDBC86BB1</link><guid isPermaLink="false">EE9A1EDE-C42F-4D6E-ADBF-307BDBC86BB1-2019-02-05-19-33-32</guid><description>File #: 15-1039&lt;br /&gt;Ver.: 1&lt;br /&gt;Agenda #: &lt;br /&gt;Type: Supplemental Improvement Resolution (Highway)&lt;br /&gt;Title: PROPOSED SUPPLEMENTAL IMPROVEMENT RESOLUTION (TRANSPORTATION AND HIGHWAYS)

Department:  Transportation and Highways  

Project Type:  Motor Fuel Tax Project Supplemental  

Request:  Refer to the Committee of Roads and Bridges  

Project:  This improvement, as proposed, included the removal of the existing bituminous pavement and reconstruction in kind, the addition of bituminous shoulders, drainage additions and adjustments, driveway reconstruction, guardrail removal and replacement, landscaping, signing, pavement marking, engineering, and other necessary highway appurtenances.  

Location:  108th Avenue, 153rd Street to 143rd Street in the Village of Orland Park. 

Section:  95-W7510-01-FP  

County Board District:  17  

Centerline Mileage:  1.27  

Fiscal Impact:  $995,000.00 

Accounts:  Motor Fuel Tax Fund:  (600 - 585 Account)  

Board Approved Date and Amount:  4/5/1995, $2,300,000.00  

Increased Amount:  $995,000.00 

Total Adjusted Amount:  $3,295,000.00  

Summary:  The Department of Transportation and Highways respectfully submits for adoptio&lt;br /&gt;Action: recommend for approval&lt;br /&gt;Result: Pass</description><category>Supplemental Improvement Resolution (Highway)</category><pubDate>Tue, 05 Feb 2019 19:33:32 GMT</pubDate></item><item><title>15-1040</title><link>https://cook-county.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=2129069&amp;GUID=1874C7FE-D6DC-47DF-BDC2-BD0BD764F624</link><guid isPermaLink="false">1874C7FE-D6DC-47DF-BDC2-BD0BD764F624-2019-02-05-19-33-32</guid><description>File #: 15-1040&lt;br /&gt;Ver.: 1&lt;br /&gt;Agenda #: &lt;br /&gt;Type: Supplemental Improvement Resolution (Highway)&lt;br /&gt;Title: PROPOSED SUPPLEMENTAL IMPROVEMENT RESOLUTION (TRANSPORTATION AND HIGHWAYS)

Department:  Transportation and Highways  

Project Type:   Motor Fuel Tax Project Supplemental Improvement Resolution  

Request:  Refer to the Committee of Roads and Bridges  

Project:   Reconstruction of Cottage Grove Avenue between Lincoln Avenue and 142nd  Street with Hot Mix Asphalt (HMA); full depth concrete pavement patching between 142nd Street and the Indiana Harbor Belt (IHB) Railroad; bituminous reconstruction to three-lanes between the IHB Railroad and 138th Street including grade crossing renewal, curb and gutter, an enclosed drainage system, pavement marking, signing, landscaping and engineering and other necessary highway appurtenances.    

Location:  Cottage Grove Avenue, Lincoln Avenue to 138th Street in the Village of Dolton   

Section:  98-W5812-03-PV

County Board District:  6 

Centerline Mileage:  0.91 

Fiscal Impact:  $4,625,000.00  

Accounts:   Motor Fuel Tax Fund (600-585 Account)  

Board Approved Date and Amount:  6/8/1999, $1,500,000.00

Increased Amou&lt;br /&gt;Action: recommend for approval&lt;br /&gt;Result: Pass</description><category>Supplemental Improvement Resolution (Highway)</category><pubDate>Tue, 05 Feb 2019 19:33:32 GMT</pubDate></item><item><title>15-1041</title><link>https://cook-county.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=2129071&amp;GUID=10B66528-2EB9-42A2-9AA1-B90F25D6FA93</link><guid isPermaLink="false">10B66528-2EB9-42A2-9AA1-B90F25D6FA93-2019-02-05-19-33-32</guid><description>File #: 15-1041&lt;br /&gt;Ver.: 1&lt;br /&gt;Agenda #: &lt;br /&gt;Type: Supplemental Improvement Resolution (Highway)&lt;br /&gt;Title: PROPOSED SUPPLEMENTAL IMPROVEMENT RESOLUTION (TRANSPORTATION AND HIGHWAYS)

Department:  Transportation and Highways  

Project Type:  Motor Fuel Tax Project  Supplemental Improvement 

Request:  Refer to the Committee of Roads and Bridges 

Project:  This improvement, as proposed, consisted of pavement reconstruction with bituminous materials, installation of an enclosed drainage system, continuous left turn lane, curb and gutter, culvert replacement, traffic signal installation, railroad grade crossing renewal, right-of-way acquisition, pavement markings, traffic protection, landscaping, consultant design with review by County Forces, and construction engineering. 

Location:  123rd Street, Cicero Avenue to Kedzie Avenue in the Village of Alsip. 

Section:  Section: 01-B7528-05-PV   

County Board District:  6

Centerline Mileage:  2.25 

Fiscal Impact:  $3,525,000.00 

Accounts:  Motor Fuel Tax Fund: (600-585 Account)  

Board Approved Date and Amount:  5/15/2001 $9,000,000.00  

Increased Amount:  $3,525,000.00 

Total Adjusted Amount:  $12,525,000.00  &lt;br /&gt;Action: recommend for approval&lt;br /&gt;Result: Pass</description><category>Supplemental Improvement Resolution (Highway)</category><pubDate>Tue, 05 Feb 2019 19:33:32 GMT</pubDate></item></channel></rss>