<?xml version="1.0" encoding="utf-8"?><rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom"><channel><title>Board of Commissioners of Cook County - Meeting of Roads and Bridges Committee (Inactive.  There is now a Transportation Committee) on 4/9/2014 at 10:00 AM</title><link>https://cook-county.legistar.com/Gateway.aspx?M=CalendarDetail&amp;From=RSS&amp;ID=678035&amp;GUID=B294F3E9-889E-48F7-BFAB-512197EA8EB6</link><description /><generator>Legistar</generator><ttl>15</ttl><atom:link href="https://cook-county.legistar.com/Feed.ashx?GUID=B294F3E9-889E-48F7-BFAB-512197EA8EB6&amp;ID=678035&amp;M=CalendarDetail" rel="self" type="application/atom+xml" /><item><title>14-1556</title><link>https://cook-county.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=1678880&amp;GUID=B99933D4-7E42-4381-B06D-30FD156FF007</link><guid isPermaLink="false">B99933D4-7E42-4381-B06D-30FD156FF007-2019-02-05-19-33-30</guid><description>File #: 14-1556&lt;br /&gt;Ver.: 1&lt;br /&gt;Agenda #: &lt;br /&gt;Type: Change in Plans and Extra Work (Highway)&lt;br /&gt;Title: PROPOSED CHANGE IN PLANS AND EXTRA WORK (TRANSPORTATION AND HIGHWAYS)

Department: Transportation and Highways

Other Part(ies):  K-Five Construction Corporation, Lemont, Illinois   

Action:  Refer to the Committee of Roads and Bridges

Section:  03-W3017-03-FP 

Location:  88th Avenue, 103rd Street to 87th Street in the Cities of Palos Hills and Hickory Hills

Board District:  17 

Good(s) or Service(s):  The quantities as shown on the contract documents were estimated for bidding purposes only.  This change represents the difference between the estimated quantities and actual field quantities of work performed with savings due to less quantities being required for porous granular embankment subgrade, protective coat, storm sewer removal, detector loop, electrical related items, pavement marking tape, Type III, 4”, and elimination of light pole foundation, 24” dia. offset, per field conditions.  

Fiscal Impact:  $34,743.64 decrease  

Accounts:  600-600 

Summary:   On 7/12/2011, your honorable Body awarded a contract to K-Five Construction Corporation, Lemont,&lt;br /&gt;Action: recommend for approval&lt;br /&gt;Result: Pass</description><category>Change in Plans and Extra Work (Highway)</category><pubDate>Tue, 05 Feb 2019 19:33:30 GMT</pubDate></item><item><title>14-1558</title><link>https://cook-county.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=1678881&amp;GUID=C8FA925F-016A-4B35-A0E2-00F3FDD2B5FC</link><guid isPermaLink="false">C8FA925F-016A-4B35-A0E2-00F3FDD2B5FC-2019-02-05-19-33-30</guid><description>File #: 14-1558&lt;br /&gt;Ver.: 1&lt;br /&gt;Agenda #: &lt;br /&gt;Type: Change in Plans and Extra Work (Highway)&lt;br /&gt;Title: PROPOSED CHANGE IN PLANS AND EXTRA WORK (TRANSPORTATION AND HIGHWAYS)

Department: Transportation and Highways

Other Part(ies):  Albin Carlson &amp; Company, Addison, Illinois 

Request:  Refer to Committee of Roads and Bridges

Section:  04-B8431-08-PV Federal Project No.: CMM-HPD-M8003-(427) State Job No.: C-91-278-04
Contract No.: 10212

Location:  171st Street, Wood Street to Ashland Avenue in the Villages of East Hazel Crest, Hazel Crest and the City of Harvey  

Board District:  5, 6 

Good(s) or Service(s):  The quantities as shown on the contract documents were estimated for bidding purposes only.  This change represents the difference between the estimated quantities and actual field quantities of work performed.

Fiscal Impact:  $15,014.66 increase 

Accounts:  Motor Fuel Tax Fund (600-600) 

Summary:  New items were added for ComEd design modification installation of soft start motor starters for two (2) twenty-five (25) HP pumps.  ..end&lt;br /&gt;Action: recommend for approval&lt;br /&gt;Result: Pass</description><category>Change in Plans and Extra Work (Highway)</category><pubDate>Tue, 05 Feb 2019 19:33:30 GMT</pubDate></item><item><title>14-1559</title><link>https://cook-county.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=1678882&amp;GUID=7BCFE795-E638-41EC-A6CA-7C97C2407688</link><guid isPermaLink="false">7BCFE795-E638-41EC-A6CA-7C97C2407688-2019-02-05-19-33-30</guid><description>File #: 14-1559&lt;br /&gt;Ver.: 1&lt;br /&gt;Agenda #: &lt;br /&gt;Type: Change in Plans and Extra Work (Highway)&lt;br /&gt;Title: PROPOSED CHANGE IN PLANS AND EXTRA WORK (TRANSPORTATION AND HIGHWAYS)

Department: Transportation and Highways

Other Part(ies):  Path Construction Company, Arlington Heights, Illinois 

Request:  Refer to the Committee of Roads and Bridges

Section:  12-W4612-06-BR

Location:  Kedzie Avenue Bridge over N.I.R.C. near 141st Street in the Villages of Robbins, Midlothian, Posen and the City of Blue Island 

Board District:  5 

Good(s) or Service(s):  Adjustment in quantities of work performed with additional quantities required for structural repairs of concrete per field conditions.  

Fiscal Impact:  $197,640.00 

Accounts:  600-600  

Additional Details:  Contract No.: 1355-12834  

Summary: This change represents the difference between the estimated quantities and actual field quantities of work performed with additional quantities required for structural repairs of concrete (depth equal to or less than 5 In.) and (depth greater than 5 in.) in the south abutment and piers 2,3,5,6,7,8, and 9, temporary concrete barrier, per field conditions...end&lt;br /&gt;Action: recommend for approval&lt;br /&gt;Result: Pass</description><category>Change in Plans and Extra Work (Highway)</category><pubDate>Tue, 05 Feb 2019 19:33:30 GMT</pubDate></item><item><title>14-1560</title><link>https://cook-county.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=1678883&amp;GUID=069DC55D-67B4-47F4-B689-66501649C3A0</link><guid isPermaLink="false">069DC55D-67B4-47F4-B689-66501649C3A0-2019-02-05-19-33-30</guid><description>File #: 14-1560&lt;br /&gt;Ver.: 1&lt;br /&gt;Agenda #: &lt;br /&gt;Type: Change in Plans and Extra Work (Highway)&lt;br /&gt;Title: PROPOSED CHANGE IN PLANS AND EXTRA WORK (TRANSPORTATION AND HIGHWAYS)

Department: Transportation and Highways

Other Part(ies):  Arrow Road Construction, Mount Prospect, Illinois  

Request:  Refer to the Committee of Roads and Bridges 

Section:  Section: 11-A5916-06-RS 
	  Contract No.: 12-28-060

Location:  Group 3-2012 Euclid Avenue, Elmhurst Road (IL-83) to Wolf Road, Euclid Avenue over Illinois Rte. 53 in the Villages of Mount Prospect, Palatine and Wheeling, in the Cities of Prospect Heights and Rolling Meadows 

Board District:  14, 17 

Good(s) or Service(s):  New Items.  Additional Barricades to be replaced and monitored due to increase curb quantity. The quantities as shown on the contract documents were estimated for bidding purposes only. 

Fiscal Impact:  $4,857.79  

Accounts:  Motor Fuel Tax Fund: 600-600 Account 

Summary:  This change represents the difference between the estimated quantities and actual field quantities of work performed...end&lt;br /&gt;Action: recommend for approval&lt;br /&gt;Result: Pass</description><category>Change in Plans and Extra Work (Highway)</category><pubDate>Tue, 05 Feb 2019 19:33:30 GMT</pubDate></item><item><title>14-1568</title><link>https://cook-county.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=1678886&amp;GUID=07C10DD4-C21A-46E5-B327-20706A34C457</link><guid isPermaLink="false">07C10DD4-C21A-46E5-B327-20706A34C457-2019-02-05-19-33-30</guid><description>File #: 14-1568&lt;br /&gt;Ver.: 1&lt;br /&gt;Agenda #: &lt;br /&gt;Type: Change in Plans and Extra Work (Highway)&lt;br /&gt;Title: PROPOSED CHANGE IN PLANS AND EXTRA WORK (TRANSPORTATION AND HIGHWAYS)

Department: Transportation and Highways

Other Part(ies):  A Lamp Concrete Contractors, Inc., Village of Schaumburg, Illinois   

Request:  Refer to the Committee of Roads and Bridges

Section:  05-A5021-07-RP 

Location:  Lake Cook Road, Pfingsten Road to Waukegan Road in the Village of Deerfield

Board District:  14 

Good(s) or Service(s):  New item was added at the request of Village of Deerfield for work on their infrastructure.  This change represents the difference between the estimated quantities and actual field quantities of work performed with more diamond grinding of concrete pavement, concrete curb, concrete sidewalk, sidewalk detectible warnings, and inlets type A.

Fiscal Impact:  $95,110.58 (increase)  

Accounts:  Motor Fuel Tax Fund 600-600

Summary: The Department of Transportation and Highways respectfully submits a change in plans and extra work of the above captioned project in the Village of Deerfield. The quantities as shown on the contract documents were estimated for b&lt;br /&gt;Action: recommend for approval&lt;br /&gt;Result: Pass</description><category>Change in Plans and Extra Work (Highway)</category><pubDate>Tue, 05 Feb 2019 19:33:30 GMT</pubDate></item><item><title>14-1783</title><link>https://cook-county.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=1678908&amp;GUID=65214C76-B2D2-44B4-8223-C17DF48D407C</link><guid isPermaLink="false">65214C76-B2D2-44B4-8223-C17DF48D407C-2019-02-05-19-33-30</guid><description>File #: 14-1783&lt;br /&gt;Ver.: 1&lt;br /&gt;Agenda #: &lt;br /&gt;Type: Supplemental Improvement Resolution (Highway)&lt;br /&gt;Title: PROPOSED SUPPLEMENTAL IMPROVEMENT RESOLUTION (TRANSPORTATION AND HIGHWAYS)

Department:  Transportation and Highways  

Project Type:  Motor Fuel Tax Project Improvement Supplemental Improvement   

Request:  Refer to the Committee on Roads and Bridges

Project:  Improvement of Smith Road, Lemont Township.

Location:  Smith Road, 135th Street to 127th Street in the Village of Lemont and Unincorporated Lemont Township  

Section:  06-V6713-02-RS

County Board District:  17

Centerline Mileage:  1.00 miles

Fiscal Impact:  $123,000.00

Accounts:  Motor Fuel Tax Fund (600-585 Account)

Board Approved Date and Amount:  12/21/2005, $525,000.00

Increased Amount:  $123,000.00

Total Adjusted Amount:  $648,000.00

Concurrence(s):  
N/A   

Summary:  This improvement, as proposed, will be milling and resurfacing the existing pavement and shall include full depth patching and pavement widening to provide competent travel lanes, aggregate shoulders, curb and gutter, pipe culvert replacement, drainage additions and adjustments, ditch regrading, traffic control and&lt;br /&gt;Action: recommend for approval&lt;br /&gt;Result: Pass</description><category>Supplemental Improvement Resolution (Highway)</category><pubDate>Tue, 05 Feb 2019 19:33:30 GMT</pubDate></item></channel></rss>