<?xml version="1.0" encoding="utf-8"?><rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom"><channel><title>Board of Commissioners of Cook County - Meeting of Transportation Committee on 3/13/2024 at 10:30 AM</title><link>https://cook-county.legistar.com/Gateway.aspx?M=CalendarDetail&amp;From=RSS&amp;ID=1182465&amp;GUID=CCE09AC7-78B2-4D08-ACC7-267B0DA8768C</link><description /><generator>Legistar</generator><ttl>15</ttl><atom:link href="https://cook-county.legistar.com/Feed.ashx?GUID=CCE09AC7-78B2-4D08-ACC7-267B0DA8768C&amp;ID=1182465&amp;M=CalendarDetail" rel="self" type="application/atom+xml" /><item><title>24-1890</title><link>https://cook-county.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=6564648&amp;GUID=9C8D5BA0-34CD-4E61-9489-EED65DC1D43E</link><guid isPermaLink="false">9C8D5BA0-34CD-4E61-9489-EED65DC1D43E-2024-03-14-17-13-34</guid><description>File #: 24-1890&lt;br /&gt;Ver.: 1&lt;br /&gt;Agenda #: &lt;br /&gt;Type: Committee Minutes&lt;br /&gt;Title: COMMITTEE MINUTES

Approval of the minutes from the meeting of 02/28/2024&lt;br /&gt;Action: approve&lt;br /&gt;Result: Pass</description><category>Committee Minutes</category><pubDate>Thu, 14 Mar 2024 17:13:34 GMT</pubDate></item><item><title>24-0006</title><link>https://cook-county.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=6551423&amp;GUID=352127DF-A638-4D53-8AF0-2D30EE0C02B5</link><guid isPermaLink="false">352127DF-A638-4D53-8AF0-2D30EE0C02B5-2024-03-18-20-33-55</guid><description>File #: 24-0006&lt;br /&gt;Ver.: 1&lt;br /&gt;Agenda #: &lt;br /&gt;Type: Contract Amendment (Highway)&lt;br /&gt;Title: PROPOSED CONTRACT AMENDMENT (TRANSPORTATION AND HIGHWAYS)

Department(s): Transportation and Highways

Vendor:  Morton Salt, Inc., Chicago, Illinois 

Request: Authorization for the Chief Procurement Officer to renew contract   

Good(s) or Service(s):  Bulk Rock Salt  

Location: DOTH Maintenance Facilities: 1 (Schaumburg), 2 (Des Plaines), 4 (Orland Park), and 5 (Riverdale) 

County Board District(s): Countywide

Original Contract Period:  3/21/2022 - 3/20/2024 with one (1) two-year renewal option      

Section: N/A

Proposed Contract Period Extension Renewal:  3/21/2024 - 3/20/2026    

Section: N/A

Total Current Contract Amount Authority:  $5,320,700.00    

Original Board Approval:  3/17/2022, $5,320,700.00    

Previous Board Increase(s) or Extension(s):  N/A    

Previous Chief Procurement Officer Increase(s) or Extension(s):  N/A      

This Increase Requested:  N/A     

Potential Fiscal Impact:  FY 2024 $1,500,000.00; FY 2025 $1,500,000.00 

Accounts:  Motor Fuel Tax: 11300.1500.29150.530224  

Contract Number(s):  2144-07011  

IDOT &lt;br /&gt;Action: recommend for approval&lt;br /&gt;Result: Pass</description><category>Contract Amendment (Highway)</category><pubDate>Mon, 18 Mar 2024 20:33:55 GMT</pubDate></item><item><title>24-0357</title><link>https://cook-county.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=6551353&amp;GUID=06853108-4D68-487B-83E8-9189343CF10C</link><guid isPermaLink="false">06853108-4D68-487B-83E8-9189343CF10C-2024-03-18-20-33-55</guid><description>File #: 24-0357&lt;br /&gt;Ver.: 1&lt;br /&gt;Agenda #: &lt;br /&gt;Type: Intergovernmental Agreement (Highway)&lt;br /&gt;Title: PROPOSED INTERGOVERNMENTAL AGREEMENT (TRANSPORTATION AND HIGHWAYS)

Department: Transportation and Highways

Other Part(ies):  City of Harvey, Illinois

Request:  Approval of proposed Intergovernmental Agreement.

Goods or Services:  Design Engineering 

Location:  City of Harvey, Illinois 

Section:  23-IICRD-05-EG

Centerline Mileage:  N/A

County Board District:  5

Agreement Number(s):  N/A

Agreement Period:  One-time agreement  

Fiscal Impact:  $320,000.00 

Accounts:  Motor Fuel Tax: 11300.1500.29150.560019  

Summary:  The Department of Transportation and Highways respectfully request approval of the proposed Intergovernmental Agreement between the County and the City of Harvey. The City will be the lead agency for design engineering services for Broadway Avenue Complete Streets Project. The County will reimburse the City for its share of design engineering services costs.&lt;br /&gt;Action: recommend for approval&lt;br /&gt;Result: Pass</description><category>Intergovernmental Agreement (Highway)</category><pubDate>Mon, 18 Mar 2024 20:33:55 GMT</pubDate></item><item><title>24-0649</title><link>https://cook-county.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=6551354&amp;GUID=38437814-B6D6-4E4C-BF75-AAB2E3E9D2A5</link><guid isPermaLink="false">38437814-B6D6-4E4C-BF75-AAB2E3E9D2A5-2024-03-18-20-33-55</guid><description>File #: 24-0649&lt;br /&gt;Ver.: 1&lt;br /&gt;Agenda #: &lt;br /&gt;Type: Intergovernmental Agreement (Highway)&lt;br /&gt;Title: PROPOSED INTERGOVERNMENTAL AGREEMENT (TRANSPORTATION AND HIGHWAYS)

Department: Transportation and Highways

Other Part(ies):  City of Markham, Illinois 

Request:  Approval of proposed Intergovernmental Agreement.

Goods or Services:   Design Engineering, Construction and Construction Engineering 

Location:  City of Markham, Illinois 

Section:   23-IICRD-08-PV

Centerline Mileage:  N/A

County Board District:  5

Agreement Number(s):  N/A

Agreement Period:  One-time agreement  

Fiscal Impact:  $400,000.00  

Accounts:   Motor Fuel Tax: 11300.1500.29150.560019  

Summary:   The Department of Transportation and Highways respectfully requests approval of the proposed intergovernmental agreement between the County and the City of Markham. The City will be the lead agency for design engineering, construction and construction engineering for roadway and ADA Improvements within the City. The County will reimburse the City for its share of design engineering services costs.&lt;br /&gt;Action: recommend for approval&lt;br /&gt;Result: Pass</description><category>Intergovernmental Agreement (Highway)</category><pubDate>Mon, 18 Mar 2024 20:33:55 GMT</pubDate></item><item><title>24-0898</title><link>https://cook-county.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=6551358&amp;GUID=4E4380C2-EAD1-4982-A67F-D4A98663CCC6</link><guid isPermaLink="false">4E4380C2-EAD1-4982-A67F-D4A98663CCC6-2024-03-18-20-33-55</guid><description>File #: 24-0898&lt;br /&gt;Ver.: 1&lt;br /&gt;Agenda #: &lt;br /&gt;Type: Improvement Resolution (Highway)&lt;br /&gt;Title: PROPOSED IMPROVEMENT RESOLUTION (TRANSPORTATION AND HIGHWAYS)

Department: Transportation and Highways

Project Type:  Motor Fuel Tax Project  

Request:  Approval of appropriation of Motor Fuel Tax Funds  

Project:  Bridge Rehabilitation 2024

Location:  Countywide

Section:  24-BRREH-00-BR

County Board District(s):  Countywide

Centerline Mileage:  N/A 

Fiscal Impact:  $550,000.00   

Accounts:  Motor Fuel Tax Fund: 11300.1500.29152.560019

Summary:  The Department of Transportation and Highways respectfully requests approval of the proposed improvement resolution for the Bridge Rehabilitation 2024 project in Cook County. The project scope consists of construction, and phase III construction engineering services.&lt;br /&gt;Action: recommend for approval&lt;br /&gt;Result: Pass</description><category>Improvement Resolution (Highway)</category><pubDate>Mon, 18 Mar 2024 20:33:55 GMT</pubDate></item><item><title>24-0900</title><link>https://cook-county.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=6551360&amp;GUID=0EC94DCE-883B-4F24-90F3-2784C2E9C35E</link><guid isPermaLink="false">0EC94DCE-883B-4F24-90F3-2784C2E9C35E-2026-03-27-20-34-45</guid><description>File #: 24-0900&lt;br /&gt;Ver.: 1&lt;br /&gt;Agenda #: &lt;br /&gt;Type: Payment Approval&lt;br /&gt;Title: PROPOSED PAYMENT APPROVAL

Department(s):  Department of Transportation and Highways  

Action:  Payment Approval

Payee:  County Material Partners, A Joint Venture, Chicago, Illinois

Good(s) or Service(s):  Material Testing Services

Fiscal Impact:  FY 2024 $24,887.42

Accounts:  Motor Fuel Tax 11300.1500.29150.560019

Contract Number(s):  1885-17255

Summary:  The Department of Transportation and Highways respectfully request the approval of a single payment to County Material Partners, A Joint Venture for completion of the contracted service within the contract period 12/1/2018 - 11/30/2023. DoTH is requesting County Board approval to pay the final payment in the amount of $24,887.42. The contract provides the County with material testing services for construction projects Countywide.  The contract expired before the invoice could be paid.&lt;br /&gt;Action: recommend for approval&lt;br /&gt;Result: Pass</description><category>Payment Approval</category><pubDate>Fri, 27 Mar 2026 20:34:45 GMT</pubDate></item><item><title>24-1076</title><link>https://cook-county.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=6551367&amp;GUID=A8E6EB4D-3BCA-4D3A-BADB-78A3EBB692BC</link><guid isPermaLink="false">A8E6EB4D-3BCA-4D3A-BADB-78A3EBB692BC-2024-03-18-20-33-55</guid><description>File #: 24-1076&lt;br /&gt;Ver.: 1&lt;br /&gt;Agenda #: &lt;br /&gt;Type: Contract Amendment (Highway)&lt;br /&gt;Title: PROPOSED CONTRACT AMENDMENT (TRANSPORTATION AND HIGHWAYS)

Department(s): Transportation and Highways

Vendor:  Hey and Associates Inc., Volo, Illinois  

Request: Authorization for the Chief Procurement Officer to renew and increase contract

Good(s) or Service(s):  Drainage Engineering Services  

Location: Countywide 

County Board District(s): Countywide

Original Contract Period:  6/1/2021 - 5/31/2024 with two (2) one-year renewal options   

Section: 19-6VDES-00-EG

Proposed Contract Period Extension Renewal:  6/1/2024 - 5/31/2025  

Section: 19-6VDES-00-EG 

Total Current Contract Amount Authority:  $750,000.00 

Original Board Approval:  5/13/2021, $750,000.00 

Previous Board Increase(s) or Extension(s):  N/A 

Previous Chief Procurement Officer Increase(s) or Extension(s):  N/A   

This Increase Requested:  $440,000.00   

Potential Fiscal Impact:  FY 2024 $125,000.00, FY 2025 $315,000.00 

Accounts:  Motor Fuel Tax:11300.1500.29150.560019 (FY 2024 $25,000.00, FY2025 $50,000.00); Motor Fuel Tax: 11300.1500.29150.521536 (FY 2024 $100,000.00,&lt;br /&gt;Action: recommend for approval&lt;br /&gt;Result: Pass</description><category>Contract Amendment (Highway)</category><pubDate>Mon, 18 Mar 2024 20:33:55 GMT</pubDate></item><item><title>24-1157</title><link>https://cook-county.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=6551368&amp;GUID=E6C48ABD-CE41-4319-8D1B-DFA72035BE01</link><guid isPermaLink="false">E6C48ABD-CE41-4319-8D1B-DFA72035BE01-2024-03-18-20-33-55</guid><description>File #: 24-1157&lt;br /&gt;Ver.: 1&lt;br /&gt;Agenda #: &lt;br /&gt;Type: Intergovernmental Agreement (Highway)&lt;br /&gt;Title: PROPOSED INTERGOVERNMENTAL AGREEMENT (TRANSPORTATION AND HIGHWAYS)

Department: Transportation and Highways

Other Part(ies):  Village of Wilmette, Illinois 

Request:  Approval of proposed Intergovernmental Agreement.

Goods or Services:  Preliminary Engineering 

Location:  Village of Wilmette, Illinois 

Section:  23-IICBP-15-ES

Centerline Mileage:  N/A

County Board District:  14

Agreement Number(s):  N/A

Agreement Period:  One-time agreement  

Fiscal Impact:  $150,000.00  

Accounts:  Motor Fuel Tax:11300.1500.29150.560019  

Summary:  The Department of Transportation and Highways respectfully requests approval of the proposed Intergovernmental Agreement between the County and the Village of Wilmette. The Village will be the lead agency for preliminary engineering for Wilmette Avenue, Glenview Road and Ridge Road Bicycle Improvements Project. The County will reimburse the Village for its share of preliminary engineering costs.&lt;br /&gt;Action: recommend for approval&lt;br /&gt;Result: Pass</description><category>Intergovernmental Agreement (Highway)</category><pubDate>Mon, 18 Mar 2024 20:33:55 GMT</pubDate></item><item><title>24-1249</title><link>https://cook-county.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=6551371&amp;GUID=3FA4BFF2-45CF-405A-B3D6-ADDE987E9C0E</link><guid isPermaLink="false">3FA4BFF2-45CF-405A-B3D6-ADDE987E9C0E-2024-06-03-22-03-43</guid><description>File #: 24-1249&lt;br /&gt;Ver.: 1&lt;br /&gt;Agenda #: &lt;br /&gt;Type: Grant Acceptance Resolution (Highway)&lt;br /&gt;Title: PROPOSED GRANT AWARD 

Department:  Transportation and Highways 

Grantee:  Cook County

Grantor:  Federal Railroad Administration  

Request: Authorization to accept grant  

Purpose:  DOTH received up to $2,888,000 in federal funds to address significant safety concerns that prevent pedestrians from gaining access to the Burlington Northern Santa Fe (BNSF) rail lines near roadway crossings between Berwyn and La Grange.  

The proposed safety improvements include adding approximately 18,300 linear feet of new fencing across 18 at-grade crossings along the BNSF corridor. This fencing will fill in gaps along the corridor that currently lack fencing. Walking channels will also be added to safely guide pedestrians across ten at-grade crossings adjacent to Metra station platforms. 

The BNSF rail line consists of three tracks which are used by both Metra commuter rail and BNSF freight rail. Metra’s BNSF line is the busiest in the Metra system with over 15.5 million riders in 2019. As of fall 2022, Metra runs 91 trains throughout the corridor each day of the week.   

Gran&lt;br /&gt;Action: recommend for approval&lt;br /&gt;Result: Pass</description><category>Grant Acceptance Resolution (Highway)</category><pubDate>Mon, 03 Jun 2024 22:03:43 GMT</pubDate></item><item><title>24-1250</title><link>https://cook-county.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=6551372&amp;GUID=694911F3-219E-4408-80EF-F7B7B9B10117</link><guid isPermaLink="false">694911F3-219E-4408-80EF-F7B7B9B10117-2024-06-03-22-23-34</guid><description>File #: 24-1250&lt;br /&gt;Ver.: 1&lt;br /&gt;Agenda #: &lt;br /&gt;Type: Grant Acceptance Resolution (Highway)&lt;br /&gt;Title: PROPOSED GRANT AWARD 

Department:  Transportation and Highways

Grantee:  Cook County  

Grantor:  Illinois Department of Transportation 

Request: Authorization to accept grant  

Purpose:  Department of Transportation and Highways (“DOTH”) received $2,000,000 in federal Surface Transportation Program (STP) funds to prepare a preliminary engineering and environmental (Phase I) study to eliminate the at-grade crossing of Cottage Grove Avenue and the four Indiana Harbor Belt (IHB) and CSX railroad tracks with either an overpass or underpass for vehicles. 

Grant Amount:  $2,000,000.00  

Grant Period:  1/1/2024 - 12/31/2029 

Fiscal Impact:  $1,000,000.00 (FY24), $1,000,000.00 (FY25)   

Accounts: 11900.1500.54352.521536. No cash match required.

Concurrences: 
The Budget Department has received all requisite documents and determined the fiscal impact on Cook County, if any

Summary:  The Department of Transportation and Highways respectfully requests approval of the proposed grant award. The Department received $2,000,000 in federal Surface Transportation Prog&lt;br /&gt;Action: recommend for approval&lt;br /&gt;Result: Pass</description><category>Grant Acceptance Resolution (Highway)</category><pubDate>Mon, 03 Jun 2024 22:23:34 GMT</pubDate></item><item><title>24-1251</title><link>https://cook-county.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=6551373&amp;GUID=6163077B-85F1-4462-B876-39ED95CFD584</link><guid isPermaLink="false">6163077B-85F1-4462-B876-39ED95CFD584-2024-06-03-22-23-34</guid><description>File #: 24-1251&lt;br /&gt;Ver.: 1&lt;br /&gt;Agenda #: &lt;br /&gt;Type: Grant Acceptance Resolution (Highway)&lt;br /&gt;Title: PROPOSED GRANT AWARD 

Department:  Transportation and Highways 

Grantee:  Cook County 

Grantor:  Illinois Department of Transportation 

Request: Authorization to accept grant  

Purpose:  Department of Transportation and Highways (“DOTH”) is the recipient of $1,400,000 in congressional directed spending for the phase II design engineering for the extension of the 606 multi-use trail on a structure above Ashland Avenue, below the Kennedy Expressway, and under the Union Pacific Railroad (UPRR) to join an existing railroad bridge over Elston.   

Grant Amount:  $1,440,000.00 

Grant Period:  1/1/2024 - 12/31/2029 

Fiscal Impact:  $720,000.00 (FY24); $720,000.00 (FY25)

Accounts: 11900.1500.54515.521536. No cash match required.

Concurrences: 
The Budget Department has received all requisite documents and determined the fiscal impact on Cook County, if any 

Summary:  The Department of Transportation and Highways respectfully requests approval of the proposed grant award. DOTH is collaborating with CDOT to advance the 606 Extension. Chicago Department of Trans&lt;br /&gt;Action: recommend for approval&lt;br /&gt;Result: Pass</description><category>Grant Acceptance Resolution (Highway)</category><pubDate>Mon, 03 Jun 2024 22:23:34 GMT</pubDate></item><item><title>24-1252</title><link>https://cook-county.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=6551374&amp;GUID=9D03E142-DD8C-4381-ABF5-94CDDE69E41A</link><guid isPermaLink="false">9D03E142-DD8C-4381-ABF5-94CDDE69E41A-2024-06-03-22-23-34</guid><description>File #: 24-1252&lt;br /&gt;Ver.: 1&lt;br /&gt;Agenda #: &lt;br /&gt;Type: Grant Acceptance Resolution (Highway)&lt;br /&gt;Title: PROPOSED GRANT AWARD 

Department:  Transportation and Highways 

Grantee:  Cook County 

Grantor:  Illinois Department of Transportation 

Request: Authorization to accept grant  

Purpose:  Department of Transportation and Highways (“DOTH”) is the recipient of $1,200,000 in Congressional Directed Spending provided through U.S. Senator Tammy Duckworth to conduct phase II design engineering for the Butler Drive reconstruction project in the Illinois International Port District (IIPD) 

Grant Amount:  $1,200,000.00 

Grant Period:  1/1/2024 - 12/31/2029 

Fiscal Impact:  $600,000.00 (FY24), $600,000.00 (FY25) 

Accounts: 11900.1500.54544.521536. No cash match required.

Concurrences: 
The Budget Department has received all requisite documents and determined the fiscal impact on Cook County, if any 

Summary:  The Department of Transportation and Highways respectfully requests approval of the proposed grant award. The grant award will be used by DOTH to perform design engineering work for roadway and drainage improvements to Butler Drive from Doty Avenue to Stony&lt;br /&gt;Action: recommend for approval&lt;br /&gt;Result: Pass</description><category>Grant Acceptance Resolution (Highway)</category><pubDate>Mon, 03 Jun 2024 22:23:34 GMT</pubDate></item><item><title>24-1253</title><link>https://cook-county.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=6551375&amp;GUID=A54FCB48-814F-462A-9502-4B816F669E16</link><guid isPermaLink="false">A54FCB48-814F-462A-9502-4B816F669E16-2024-06-03-22-33-36</guid><description>File #: 24-1253&lt;br /&gt;Ver.: 1&lt;br /&gt;Agenda #: &lt;br /&gt;Type: Grant Acceptance Resolution (Highway)&lt;br /&gt;Title: PROPOSED GRANT AWARD 

Department:  Transportation and Highways 

Grantee:  Cook County 

Grantor:  Federal Transit Administration  

Request: Authorization to accept grant  

Purpose:  DOTH is the recipient of $3,199,042 in CMAQ funding for phase II design engineering and construction to the extend the pedway under the City-County building at 118 N. Clark St connecting to both the existing underground connections to the Thompson Center to the north and LaSalle Street crossing to the west

Grant Amount:  $3,199,042.00  

Grant Period:  1/1/2024 - 12/31/2029 

Fiscal Impact:  $1,599,521.00 (FY24), $1,599,521.00 (FY25)  

Accounts: 11900.1500.54522.560019. No cash match required.

Concurrences: 
The Budget Department has received all requisite documents and determined the fiscal impact on Cook County, if any

Summary:  The Department of Transportation and Highways respectfully requests approval of the proposed grant award. The grant award will be used by DOTH to extend the pedway under the City-County building at 118 N. Clark St connecting to both the existing un&lt;br /&gt;Action: recommend for approval&lt;br /&gt;Result: Pass</description><category>Grant Acceptance Resolution (Highway)</category><pubDate>Mon, 03 Jun 2024 22:33:36 GMT</pubDate></item><item><title>24-1254</title><link>https://cook-county.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=6551376&amp;GUID=769CDC59-1140-4B1E-8808-CAFD2CEC38C3</link><guid isPermaLink="false">769CDC59-1140-4B1E-8808-CAFD2CEC38C3-2024-06-03-22-33-36</guid><description>File #: 24-1254&lt;br /&gt;Ver.: 1&lt;br /&gt;Agenda #: &lt;br /&gt;Type: Grant Acceptance Resolution (Highway)&lt;br /&gt;Title: PROPOSED GRANT AWARD 

Department:  Transportation and Highways 

Grantee:  Cook County  

Grantor:  Illinois Department of Transportation (IDOT)  

Request: Authorization to accept grant  

Purpose:  The Statewide Planning &amp; Research Program (SPR) grant will support the development of the Cook County 2050 Long Range Transportation Plan. The plan will include the following elements: employment, land use, and travel analysis to forecast travel demand; transportation needs analysis to identify capital investments and operational improvements to address system deficiencies; future revenue scenarios and investment recommendations; extensive multi-channel public engagement; and policy recommendations to guide departmental roles and
actions.  

Grant Amount:  $225,000.00 

Grant Period:  1/1/2024 - 12/31/2027 

Fiscal Impact:   $225,000.00 (FY24: $50,000.00; FY25: $125,000.00; FY26: $50,000.00) 

Accounts: 11900.1500.54545.520830. Cash match not required.

Concurrences: 
The Budget Department has received all requisite documents and determined the fiscal impact on Coo&lt;br /&gt;Action: recommend for approval&lt;br /&gt;Result: Pass</description><category>Grant Acceptance Resolution (Highway)</category><pubDate>Mon, 03 Jun 2024 22:33:36 GMT</pubDate></item><item><title>24-1255</title><link>https://cook-county.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=6551377&amp;GUID=77D2B2B2-8DA6-4288-8A3D-226AD1DFA63A</link><guid isPermaLink="false">77D2B2B2-8DA6-4288-8A3D-226AD1DFA63A-2024-06-03-22-53-17</guid><description>File #: 24-1255&lt;br /&gt;Ver.: 1&lt;br /&gt;Agenda #: &lt;br /&gt;Type: Grant Acceptance Resolution (Highway)&lt;br /&gt;Title: PROPOSED GRANT AWARD 

Department:  Transportation and Highways 

Grantee:  Cook County   

Grantor:  Illinois Department of Transportation  

Request: Authorization to accept grant  

Purpose:  Cook County received $3.5 million in federal (STP Shared) funding to conduct preliminary engineering for the 1st Avenue and Union Pacific Railroad location, which is included within the CREATE program as GS12a.

Grant Amount:  $3,500,000.00  

Grant Period:  1/1/2025 - 12/31/2030 

Fiscal Impact:  FY25 ($250,000.00), FY26 ($1,000,000.00), FY27 ($1,000,000.00), FY28 ($1,250,000.00) 

Accounts: No cash match required. 11900.1500.54540.521536.

Concurrences: 
The Budget Department has received all requisite documents and determined the fiscal impact on Cook County, if any 

Summary:  The Department of Transportation and Highways respectfully requests approval of the proposed grant award. The funding will be used to study a grade separation or alternative at 1st Avenue and Union Pacific Railroad in the Village of Maywood. Cook County will serve as project sponsor. Cook Coun&lt;br /&gt;Action: recommend for approval&lt;br /&gt;Result: Pass</description><category>Grant Acceptance Resolution (Highway)</category><pubDate>Mon, 03 Jun 2024 22:53:17 GMT</pubDate></item><item><title>24-1258</title><link>https://cook-county.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=6551379&amp;GUID=5EBD1FFC-5370-42B1-869D-B8D2F8A43EA8</link><guid isPermaLink="false">5EBD1FFC-5370-42B1-869D-B8D2F8A43EA8-2024-03-18-20-33-55</guid><description>File #: 24-1258&lt;br /&gt;Ver.: 1&lt;br /&gt;Agenda #: &lt;br /&gt;Type: Contract Amendment (Highway)&lt;br /&gt;Title: PROPOSED CONTRACT AMENDMENT (TRANSPORTATION AND HIGHWAYS)

Department(s): Transportation and Highways

Vendor:  Builders Asphalt LLC, Hillside, Illinois   

Request: Authorization for the Chief Procurement Officer to renew and increase contract   

Good(s) or Service(s):  Bituminous Materials (Hot Patch) and Prime Coat Material, North Area   

Location: Department of Transportation and Highways (“DOTH”): Maintenance Districts 1 (Schaumburg) and 2 (Des Plaines) 

County Board District(s): N/A 

Original Contract Period:  8/1/2022 - 7/31/2024 with one (1) two-year renewal option     

Section: N/A 

Proposed Contract Period Extension Renewal:  8/1/2024 - 7/31/2026   

Section: N/A 

Total Current Contract Amount Authority:  $262,540.00  

Original Board Approval:  6/16/2022, $262,540.00  

Previous Board Increase(s) or Extension(s):  N/A  

Previous Chief Procurement Officer Increase(s) or Extension(s):  N/A    

This Increase Requested:  $262,540.00    

Potential Fiscal Impact:  FY 2024 $75,000.00, FY 2025 $140,000.00, FY 2026 $47,540.00 

Accounts: &lt;br /&gt;Action: recommend for approval&lt;br /&gt;Result: Pass</description><category>Contract Amendment (Highway)</category><pubDate>Mon, 18 Mar 2024 20:33:55 GMT</pubDate></item><item><title>24-1260</title><link>https://cook-county.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=6551381&amp;GUID=F4411451-1F04-415C-A614-F876B3DA9E0C</link><guid isPermaLink="false">F4411451-1F04-415C-A614-F876B3DA9E0C-2024-03-18-20-33-55</guid><description>File #: 24-1260&lt;br /&gt;Ver.: 1&lt;br /&gt;Agenda #: &lt;br /&gt;Type: Intergovernmental Agreement (Highway)&lt;br /&gt;Title: PROPOSED INTERGOVERNMENTAL AGREEMENT (TRANSPORTATION AND HIGHWAYS)

Department: Transportation and Highways

Other Part(ies):  Village of Brookfield, Illinois 

Request:  Approval of proposed Intergovernmental Agreement.

Goods or Services:   Preliminary Engineering 

Location:  Village of Brookfield, Illinois 

Section:   24-LPRT-00-BT

Centerline Mileage:  N/A

County Board District:  16

Agreement Number(s):  N/A

Agreement Period:  One-time agreement  

Fiscal Impact:  $300,000.00 

Accounts:   Motor Fuel Tax: 11300.1500.29150.560019  

Summary:  The Department of Transportation and Highways respectfully request approval of the proposed Intergovernmental agreement between the County and the Village of Brookfield. The Village will be the lead agency for additional preliminary engineering services for the construction of the Lower Des Plaines River Trail Extension Project. The County will reimburse the Village for its share of additional preliminary engineering services costs.&lt;br /&gt;Action: recommend for approval&lt;br /&gt;Result: Pass</description><category>Intergovernmental Agreement (Highway)</category><pubDate>Mon, 18 Mar 2024 20:33:55 GMT</pubDate></item><item><title>24-1332</title><link>https://cook-county.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=6551249&amp;GUID=C87F9BD6-DD30-40B0-B35E-63ACCC2F1AAA</link><guid isPermaLink="false">C87F9BD6-DD30-40B0-B35E-63ACCC2F1AAA-2024-03-18-20-33-55</guid><description>File #: 24-1332&lt;br /&gt;Ver.: 1&lt;br /&gt;Agenda #: &lt;br /&gt;Type: Improvement Resolution (Highway)&lt;br /&gt;Title: PROPOSED IMPROVEMENT RESOLUTION (TRANSPORTATION AND HIGHWAYS)

Department: Transportation and Highways

Project Type:  Motor Fuel Tax Project  

Request:  Approval of appropriation of Motor Fuel Tax Funds  

Project:  Cottage Grove Avenue Grade Separation

Location:  Village of Dolton, Illinois 

Section:  23-CGAGS-00-RR

County Board District(s):  5, 6 

Centerline Mileage:  N/A 

Fiscal Impact:  $2,500,000.00 (FY24: $705,000.00; FY25: $1,000,000.00; FY26: $500,000.00; FY27: $250,000.00)

Accounts:  Motor Fuel Tax: 11300.1500.29150.521536

Summary:  The Department of Transportation and Highways respectfully requests approval of the proposed improvement resolution for work being done in the Village of Dolton. The project scope consists of preliminary engineering and an environmental (Phase I) study to eliminate the at-grade rail crossings.&lt;br /&gt;Action: recommend for approval&lt;br /&gt;Result: Pass</description><category>Improvement Resolution (Highway)</category><pubDate>Mon, 18 Mar 2024 20:33:55 GMT</pubDate></item></channel></rss>