File #: 26-2046    Version: 1 Name: Contract Amendment No. 3 for Sauk Trail: Western Avenue to Ashland Avenue, co. number 2038-18488D A3
Type: Contract Amendment (Highway) Status: Agenda Ready
File created: 7/22/2026 In control: Administration, Bureau of
On agenda: 9/24/2026 Final action:
Title: PROPOSED CONTRACT AMENDMENT (TRANSPORTATION AND HIGHWAYS) Department(s): Transportation and Highways Vendor: Christopher B. Burke Engineering, Ltd., Rosemont, Illinois Request: Authorization for the Chief Procurement Officer to extend and increase contract Good(s) or Service(s): Preliminary Engineering and Design Engineering Services Location: Sauk Trail – Western Avenue to Chicago Road County Board District(s): 5, 6 Original Contract Period: 10/1/2022 – 9/30/2024 Section: 21-C1131-00-PV Proposed Contract Period Extension: 10/1/2026 – 9/30/2029 Section: N/A Total Current Contract Amount Authority: $1,402,425.00 Original Board Approval: 9/22/2022, $1,130,726.00 Previous Board Increase(s) or Extension(s): 7/24/2025, (10/1/2025 – 9/30/2026), $271,699.00 Previous Chief Procurement Officer Increase(s) or Extension(s): 11/26/2024, (10/1/2024 – 9/30/2025) Contract Utilization: The vendor has met the Minority- and Women-owned Business Enterpri...
Indexes: JENNIFER (SIS) KILLEN, Superintendent, Department of Transportation and Highways
Attachments: 1. 26-2046 Recommendation Letter_Contract for Sauk Trail Western Avenue to Ashland Avenue (Chicago Road) (2038-18488D A3)_BOARD, 2. 26-2046 Original Contract_Contract for Sauk Trail Western Avenue to Ashland Avenue (Chicago Road) (2038-18488D A3)_BOARD, 3. 26-2046 Amendment 1_Contract for Sauk Trail Western Avenue to Ashland Avenue (Chicago Road) (2038-18488D A3)_BOARD, 4. 26-2046 Amendment 2_Contract for Sauk Trail Western Avenue to Ashland Avenue (Chicago Road) (2038-18488D A3)_BOARD
Date Ver.Action ByMotionResultAction DetailsMeeting DetailsVideo
No records to display.

title

PROPOSED CONTRACT AMENDMENT (TRANSPORTATION AND HIGHWAYS)

 

Department(s): Transportation and Highways

 

Vendor:   Christopher B. Burke Engineering, Ltd., Rosemont, Illinois  

 

Request: Authorization for the Chief Procurement Officer to extend and increase  contract  

 

Good(s) or Service(s):   Preliminary Engineering and Design Engineering Services 

 

Location: Sauk Trail - Western Avenue to Chicago Road

 

County Board District(s):  5, 6

 

Original Contract Period:   10/1/2022 - 9/30/2024  

 

Section:  21-C1131-00-PV

 

Proposed Contract Period Extension:   10/1/2026 - 9/30/2029 

 

Section:  N/A

 

Total Current Contract Amount Authority:  $1,402,425.00

 

Original Board Approval:  9/22/2022, $1,130,726.00

 

Previous Board Increase(s) or Extension(s):  7/24/2025, (10/1/2025 - 9/30/2026), $271,699.00

 

Previous Chief Procurement Officer Increase(s) or Extension(s):  11/26/2024, (10/1/2024 - 9/30/2025)  

 

Contract Utilization: The vendor has met the Minority- and Women-owned Business Enterprise Ordinance via: Direct participation.

 

This Increase Requested:  $1,982,578.00  

 

Potential Fiscal Impact:  FY 2026 $100,00.00, FY 2027 $700,000.00, FY 2028 $700,000.00, FY 2029 $482,578.00

 

Accounts:   Rebuild Illinois Bond: 11300.1500.29152.560019 

 

Contract Number(s):  2038-18488D

 

IDOT Contract Number(s): N/A

 

Federal Project Number(s): N/A

 

Federal Job Number(s): N/A

 

Summary:  The Department of Transportation and Highways respectfully requests approval of the proposed Contract Amendment 3 between the County and Christopher B. Burke Engineering, Ltd., Rosemont, Illinois.

 

This contract provides for the preparation of preliminary engineering environmental (Phase I) study and design engineering (Phase II) for the reconstruction of Sauk Trail from Western Avenue to Chicago Road, including reconstruction of the bridge structure over Thorn Creek. The improvements will enable the Department to protect the public investment in the highway system and provide a safe and sustainable highway in accordance with the Department’s mission statement.

 

This amendment is needed to support additional tasks identified during the Phase I to complete the study and better meet the project goals. These additional tasks include extending the eastern limit of the project by approximately 1,500' to allow the proposed shared-use path to connect in with an existing sidewalk system, designing additional improvements at the intersection of Sauk Trail and Western Avenue, and updating the Phase I documentation to keep the project eligible for federal funding in the future. Additionally, this amendment includes the completion of detailed design engineering and land acquisition services (Phase II).

 

This contract was awarded pursuant to a publicly advertised Request for Qualifications (RFQ) in accordance with Cook County Procurement Code. Christopher B. Burke Engineering, Ltd. was selected based on established evaluation criteria.

end