PROPOSED CONTRACT AMENDMENT (TRANSPORTATION AND HIGHWAYS)
Department(s): Transportation and Highways
Vendor: Gallagher Asphalt Corporation of Thornton, Illinois
Action: Refer to Transportation Committee
Request: Authorization for the Chief Procurement Officer to increase contract
Good(s) or Service(s): Construction Services
Location:
Pavement Maintenance Program South 2021
94th Avenue-171st Street to W. 159th Street
135th Street-190 Feet East of Howe Drive to S. Harlem Avenue
167th Street-Kedzie Avenue to California Avenue
Wolf Road-Plainfield Road to 31st Street
Joe Orr Road-Western Avenue to Ashland Avenue
Joe Orr Road-State Street to Cottage Grove Avenue
Joe Orr Road-295 ft. West of Love Drive to 1180 ft. East of Stoney Island Avenue
Steger Road-Union Street to Ashland Avenue
Steger Road-Calumet Expressway to Longwood Drive
Narragansett Avenue-State Road to 95 ft. South of W 86th Street
County Board District(s): 4, 5, 6 11, 16, 17
Original Contract Period: 2/24/2022 - 11/30/2025
Section: 23-8PVPS-00-GM
Proposed Contract Period Extension: N/A
Section: N/A
Total Current Contract Amount Authority: $18,691,724.75
Original Board Approval: 2/10/2022, $17,370,167.00
Previous Board Increase(s) or Extension(s): 1/26/2023, $1,321,557.75
Previous Chief Procurement Officer Increase(s) or Extension(s): N/A
This Increase Requested: $1,195,392.89
Potential Fiscal Impact: FY 2024 $1,195,392.89
Accounts: Motor Fuel Tax: 11300.1500.29150.540370
Contract Number(s): 2119-09141
IDOT Contract Number(s): N/A
Federal Project Number(s): N/A
Federal Job Number(s): N/A
Concurrences:
The vendor has met the Minority- and Women-owned Business Enterprise Ordinance via: Direct participation..
The Chief Procurement Officer concurs.
Summary: The Department of Transportation and Highways respectfully requests approval of the proposed Contract Amendment No. 2 between Cook County and Gallagher Asphalt Corporation, Thornton, Illinois.
This contract was approved by the board on February 10, 2022, for Pavement Maintenance - South 2021 located within the Cook County Board Districts 4, 5, 6, 11, 16 and 17 in accordance with the plans and specifications. The amendment accounts for increased quantities due to unforeseen design changes, field conditions and utility structure deterioration.
Quantities adjustment included work associated with patching, grinding, sidewalks, asphalt median, pavement markings, longitudinal joint repairs, geo-grid reinforcing mat, saw-cutting, curb and gutters, changeable message signage, structure frame and lid adjustments, handhole adjustments, seeding and sodding, roadway maintenance, and bridge joint repairs.
This contract was awarded pursuant to a publicly advertised Invitation for Bids (IFB) in accordance with the Cook County Procurement Code. Gallagher Asphalt Corporation was the lowest, responsive, and responsible bidder.