File #: 14-2519    Version: 1 Name: 5-21-2014 Cottage Grove
Type: Improvement Resolution (Highway) Status: Approved
File created: 4/10/2014 In control: Administration, Bureau of
On agenda: 5/21/2014 Final action: 5/21/2014
Title: PROPOSED IMPROVEMENT RESOLUTION (TRANSPORTATION AND HIGHWAYS) Department: Transportation and Highways Project Type: Motor Fuel Tax Project Improvement Resolution Request: Approval of appropriation of Motor Fuel Tax Funds Project: Repair of existing bridge Location: Cottage Grove Avenue over North Creek (south of 183rd Street) in unincorporated Bloom Township Section: 14-W5906-04-BR County Board District(s): 5 Centerline Mileage: N/A Fiscal Impact: $510,000.00 Accounts: Motor Fuel Tax Fund: (600-585 Account) Summary: This improvement, as proposed, shall be repair of the existing bridge and shall include removal and replacement of the existing expansion joints, approach slab repairs (partial and full depth), structural repair of concrete, concrete deck (partial depth) and concrete median repairs, traffic control and protection, engineering and other necessary highway appurtenances. This improvement is needed to protect the public ...
Indexes: (Inactive) JOHN YONAN, P.E., Superintendent, Department of Transportation and Highways
title
PROPOSED IMPROVEMENT RESOLUTION (TRANSPORTATION AND HIGHWAYS)
 
Department: Transportation and Highways
 
Project Type:  Motor Fuel Tax Project Improvement Resolution  
 
Request:  Approval of appropriation of Motor Fuel Tax Funds  
 
Project:  Repair of existing bridge
 
Location:  Cottage Grove Avenue over North Creek (south of 183rd Street) in unincorporated Bloom Township
 
Section:  14-W5906-04-BR
 
County Board District(s):  5
 
Centerline Mileage:   N/A
 
Fiscal Impact:  $510,000.00  
 
Accounts:  Motor Fuel Tax Fund: (600-585 Account)
 
Summary:  This improvement, as proposed, shall be repair of the existing bridge and shall include removal and replacement of the existing expansion joints, approach slab repairs (partial and full depth), structural repair of concrete, concrete deck (partial depth) and concrete median repairs, traffic control and protection, engineering and other necessary highway appurtenances.
 
This improvement is needed to protect the public investment in the highway system and provide a safe, efficient and sustainable highway.
end