title
PROPOSED SUPPLEMENTAL IMPROVEMENT RESOLUTION (TRANSPORTATION AND HIGHWAYS)
Department: Transportation and Highways
Project Type: Motor Fuel Tax Project Supplemental Improvement Resolution
Request: Refer to the Committee of Roads and Bridges
Project: Reconstruction, resurfacing and widening, etc.
Location: 153rd Street, Wolfe Road to 100th Avenue in the Village of Orland Park and unincorporated Orland Township
Section: 02-B5620-04-FP
County Board District: 17
Centerline Mileage: 1.44
Fiscal Impact: $1,110,000.00
Accounts: Motor Fuel Tax Fund (600-585 Account)
Board Approved Date and Amount: 02/01/2005, $7,000,000.00
Increased Amount: $1,110,000.00
Total Adjusted Amount: $8,110,000.00
Summary: This improvement, as proposed, shall be for the widening and resurfacing from Wolf Road to 108th Avenue to include 1 lane in each direction separated by a continuous/flush median, with paved shoulders and ditch drainage; pavement reconstruction and widening with bituminous materials from 108th Avenue to 100th Avenue to include 2 lanes in each direction separated by a continuous/flush median and shall include curb and gutter, enclosed drainage system and railroad crossing renewal; and includes traffic signals and channelization, sidewalks, right-of-way acquisition, traffic control, signing, pavement marking, landscaping, construction engineering and other necessary highway appurtenances.
On 2/1/2005, your Honorable Body approved an Improvement Resolution in the amount of $7,000,000.00. Additional funding is needed due to subsequent expansion of the improvement scope to include top soil filling, seeding and sodding, construction of an interlocking block retaining wall, sewer, pipe culvert and pipe underdrains. The construction was completed on 4/23/2009, and this supplement is necessary for accounting closure.