title
PROPOSED COMPLETION OF CONSTRUCTION APPROVAL RESOLUTION (TRANSPORTATION AND HIGHWAYS)
Department: Transportation and Highways
Other Part(ies): Capitol Cement Company, Chicago, Illinois
Action: Approval of the Completion of Construction Resolution
Good(s) or Service(s): Construction and Construction Engineering
Location of Project: 156th Street- Commercial Ave. to Halsted St.
Section: 14-15632-01-FP
County Board District: 5
Contract Number: 1685-15592
Federal Project Number: DR-IN-R3-01
Federal Job Number: C-91-184-15
Final Cost: $1,304,436.98
Account:
CDBG: 11900.1500.50685.521536
EDP: 11900.1500.53439.521536
Percent Above or Below Construction Contract Bid Amount: $76,753.88 or 6.25% above the Construction Engineering Contract Amount.
Summary: The Department of Transportation and Highways respectfully requests approval of the Proposed Completion of Construction Resolution for work done by Capitol Cement Chicago, Illinois. The proposed improvement consisting of reconstruction of the existing two lane roadway to a 24 feet wide concrete pavement with aggregate subgrade, combination concrete curb and gutter, storm sewer/combination sewer, parkway catch basins, cast-in-place pipe lining, signing, landscaping with topsoil, seeding and traffic control and protection and any collateral and auxiliary work as needed to complete the project. The increases are attributed to the difference between the estimated quantities and actual field quantities of work performed with increase in earth excavation, bituminous related items, storm sewer related items and scale pit removal.