File #: 14-1783    Version: 1 Name: 3-12-2014 Sup Imp Smith Road 06-V6713-02-RS
Type: Supplemental Improvement Resolution (Highway) Status: Approved
File created: 2/25/2014 In control: Roads and Bridges Committee (Inactive. There is now a Transportation Committee)
On agenda: 3/12/2014 Final action: 4/9/2014
Title: PROPOSED SUPPLEMENTAL IMPROVEMENT RESOLUTION (TRANSPORTATION AND HIGHWAYS) Department: Transportation and Highways Project Type: Motor Fuel Tax Project Improvement Supplemental Improvement Request: Refer to the Committee on Roads and Bridges Project: Improvement of Smith Road, Lemont Township. Location: Smith Road, 135th Street to 127th Street in the Village of Lemont and Unincorporated Lemont Township Section: 06-V6713-02-RS County Board District: 17 Centerline Mileage: 1.00 miles Fiscal Impact: $123,000.00 Accounts: Motor Fuel Tax Fund (600-585 Account) Board Approved Date and Amount: 12/21/2005, $525,000.00 Increased Amount: $123,000.00 Total Adjusted Amount: $648,000.00 Concurrence(s): N/A Summary: This improvement, as proposed, will be milling and resurfacing the existing pavement and shall include full depth patching and pavement widening to provide competent travel lanes, aggregate shoulders, curb and gutter...
Indexes: (Inactive) JOHN YONAN, P.E., Superintendent, Department of Transportation and Highways
title
PROPOSED SUPPLEMENTAL IMPROVEMENT RESOLUTION (TRANSPORTATION AND HIGHWAYS)
 
Department:  Transportation and Highways  
 
Project Type:  Motor Fuel Tax Project Improvement Supplemental Improvement   
 
Request:  Refer to the Committee on Roads and Bridges
 
Project:  Improvement of Smith Road, Lemont Township.
 
Location:  Smith Road, 135th Street to 127th Street in the Village of Lemont and Unincorporated Lemont Township  
 
Section:  06-V6713-02-RS
 
County Board District:  17
 
Centerline Mileage:  1.00 miles
 
Fiscal Impact:  $123,000.00
 
Accounts:  Motor Fuel Tax Fund (600-585 Account)
 
Board Approved Date and Amount:  12/21/2005, $525,000.00
 
Increased Amount:  $123,000.00
 
Total Adjusted Amount:  $648,000.00
 
Concurrence(s):  
N/A   
 
Summary:  This improvement, as proposed, will be milling and resurfacing the existing pavement and shall include full depth patching and pavement widening to provide competent travel lanes, aggregate shoulders, curb and gutter, pipe culvert replacement, drainage additions and adjustments, ditch regrading, traffic control and protection, landscaping, pavement marking, engineering and other necessary highway appurtenances.
 
On 12/21/2005 your Honorable Body approved an Improvement Resolution appropriating $525,000.00 towards completion of this improvement.  At the time of this improvement resolution, the primary scope of the improvement was limited to milling and resurfacing with full depth patching.  
 
Subsequently, the inadequate pavement width necessitated a change in the scope of work to include pavement widening.  Additional funding is needed for pavement widening to provide competent travel lanes, aggregate shoulders, curb and gutter, pipe culvert replacement and ditch regrading.
end