title
PROPOSED CHANGE IN PLANS AND EXTRA WORK (TRANSPORTATION AND HIGHWAYS)
Department: Transportation and Highways
Other Part(ies): D. Construction, Inc., Coal City, Illinois
Action: Refer to Road and Bridge Committee - Proposed Change in Plans and Extra Work
Section: 12-W3913-04-RS
Contract Number(s): 13-23-022
IDOT Contract Number(s): N/A
Federal Project Number(s): N/A
Federal Job Number(s): N/A
Location:
Central Ave. -135th St. to 127th St.
Central Ave.-Over Tinley Creek
151st Street at Jack Hille Middle School
104th Avenue South of 167th Street
Board District: 6 and 17
Good(s) or Service(s): The improvement consisted of asphalt pavement removal and resurfacing, curb and gutter removal and replacement, drainage additions and adjustments including ditch regrading, parkway and ditch restoration with sodding and topsoil, steel plate beam guardrail removal, bridge repair, pavement marking, traffic signal, traffic control and protection, and other related work to complete the project.
Fiscal Impact: $261,158.88 (decrease)
Accounts: 11566.1500.29150.560019
Summary: The Department of Transportation and Highways respectfully submits a change in plans and extra work on the above captioned project in the Villages of Alsip, Crestwood, Orland Park and in the City of Oak Forest.
On 4/17/2013, your honorable Body awarded a contract to D. Construction, Inc., Coal City, Illinois for the aforesaid improvement to be completed in accordance with the plans and specifications.
The quantities as shown on the contract documents were estimated for bidding purposes only. This change represents the difference between the estimated quantities and actual field quantities of work performed with savings due to elimination of contract extra work and a credit for liquidated damages.
New item was needed for concrete driveway pavement replacement which was required but not included in the original contract.
end