File #: 15-5354    Version: 1 Name: Thorton Township
Type: Appropriating Resolution (Highway) Status: Approved
File created: 9/8/2015 In control: Board of Commissioners
On agenda: 10/7/2015 Final action: 10/7/2015
Title: PROPOSED APPROPRIATING RESOLUTION (TRANSPORTATION AND HIGHWAYS) Department: Transportation and Highways Other Part(ies): Thornton Township in the State of Illinois Request: Approval Good(s) or Services(s): Pavement Rehabilitation Various Locations throughout Thornton Township Appropriate additional funding is required due to an increase in the number of pavement locations to be resurfaced throughout Thornton Township Location: Various Locations throughout Thornton Township in County Board Districts 4, 5, 6 Section: 14-REHAB-02-RS Fiscal Impact: $200,000.00 Accounts: Motor Fuel Tax Fund Account 600-600 Summary: The Department of Transportation and Highways respectfully submits for adoption a supplemental resolution appropriating funds for the improvement of County Highways at various locations within out Thornton Township, Cook County. This improvement, as proposed, will consist of milling and resurfacing of the existing bituminous pavement wit...
Indexes: (Inactive) JOHN YONAN, P.E., Superintendent, Department of Transportation and Highways

title

PROPOSED APPROPRIATING RESOLUTION (TRANSPORTATION AND HIGHWAYS)

 

Department: Transportation and Highways

 

Other Part(ies):  Thornton Township in the State of Illinois 

 

Request:  Approval

 

Good(s) or Services(s):  Pavement Rehabilitation Various Locations throughout Thornton Township Appropriate additional funding is required due to an increase in the number of pavement locations to be resurfaced throughout Thornton Township

 

Location:  Various Locations throughout Thornton Township in County Board Districts 4, 5, 6

 

Section:  14-REHAB-02-RS 

 

Fiscal Impact:   $200,000.00

 

Accounts:  Motor Fuel Tax Fund Account 600-600

 

Summary:  The Department of Transportation and Highways respectfully submits for adoption a supplemental resolution appropriating funds for the improvement of County Highways at various locations within out Thornton Township, Cook County. This improvement, as proposed, will consist of milling and resurfacing of the existing bituminous pavement with hot-mix asphalt or diamond grinding existing concrete pavement and shall include repairing, patching, drainage repairs and adjustments, sidewalk removal and replacement, traffic control and protection, pavement marking, landscaping, engineering and other necessary highway appurtenances. This supplemental appropriation improvement will rehabilitate various severely deteriorated roadway segments which suffered from the unusually harsh winter weather and are needed to protect the public investment in the highway system and provide safe, efficient and sustainable highways. On 11/19/2014, your Honorable Body approved a Resolution Appropriating $500,000.00 for this improvement.   .end