File #: 14-1559    Version: 1 Name: 3-14-2014 C and P Kedzie 12-W4612-06-BR
Type: Change in Plans and Extra Work (Highway) Status: Approved
File created: 2/13/2014 In control: Roads and Bridges Committee (Inactive. There is now a Transportation Committee)
On agenda: 3/12/2014 Final action: 4/9/2014
Title: PROPOSED CHANGE IN PLANS AND EXTRA WORK (TRANSPORTATION AND HIGHWAYS) Department: Transportation and Highways Other Part(ies): Path Construction Company, Arlington Heights, Illinois Request: Refer to the Committee of Roads and Bridges Section: 12-W4612-06-BR Location: Kedzie Avenue Bridge over N.I.R.C. near 141st Street in the Villages of Robbins, Midlothian, Posen and the City of Blue Island Board District: 5 Good(s) or Service(s): Adjustment in quantities of work performed with additional quantities required for structural repairs of concrete per field conditions. Fiscal Impact: $197,640.00 Accounts: 600-600 Additional Details: Contract No.: 1355-12834 Summary: This change represents the difference between the estimated quantities and actual field quantities of work performed with additional quantities required for structural repairs of concrete (depth equal to or less than 5 In.) and (depth greater than 5 in.) in the south abutment...
Indexes: (Inactive) JOHN YONAN, P.E., Superintendent, Department of Transportation and Highways
title
PROPOSED CHANGE IN PLANS AND EXTRA WORK (TRANSPORTATION AND HIGHWAYS)
 
Department: Transportation and Highways
 
Other Part(ies):  Path Construction Company, Arlington Heights, Illinois
 
Request:  Refer to the Committee of Roads and Bridges
 
Section:  12-W4612-06-BR
 
Location:  Kedzie Avenue Bridge over N.I.R.C. near 141st Street in the Villages of Robbins, Midlothian, Posen and the City of Blue Island
 
Board District:  5
 
Good(s) or Service(s):  Adjustment in quantities of work performed with additional quantities required for structural repairs of concrete per field conditions.  
 
Fiscal Impact:  $197,640.00
 
Accounts:  600-600  
 
Additional Details:  Contract No.: 1355-12834  
 
Summary: This change represents the difference between the estimated quantities and actual field quantities of work performed with additional quantities required for structural repairs of concrete (depth equal to or less than 5 In.) and (depth greater than 5 in.) in the south abutment and piers 2,3,5,6,7,8, and 9, temporary concrete barrier, per field conditions.end