File #: 15-4385    Version: 1 Name: Appr Traffic Sig Engineering Services
Type: Appropriating Resolution (Highway) Status: Approved
File created: 7/7/2015 In control: Board of Commissioners
On agenda: 7/29/2015 Final action: 7/29/2015
Title: PROPOSED IMPROVEMENT RESOLUTION (TRANSPORTATION AND HIGHWAYS) Department: Transportation and Highways Project Type: Motor Fuel Tax Project Improvement Request: Approval of appropriation of Motor Fuel Tax Funds Project: Electrical Engineering Design Services Location: Various Locations throughout Cook County in County Board Districts: Countywide Section: 15-8TSDS-11-ES County Board District(s): Countywide Centerline Mileage: N/A Fiscal Impact: $300,000.00 Accounts: Motor Fuel Tax Fund: (600-585 Account) Summary: The Department of Transportation and Highways respectfully submits for adoption a resolution appropriating funds for electrical engineering design services related to traffic signals at various locations throughout Cook County by an outside engineering consultant. These services as proposed will consist of signal coordination and timing studies; preparation of traffic signal warrant studies and traffic signal design plans ...
Indexes: (Inactive) JOHN YONAN, P.E., Superintendent, Department of Transportation and Highways

title

PROPOSED IMPROVEMENT RESOLUTION (TRANSPORTATION AND HIGHWAYS)

 

Department: Transportation and Highways

 

Project Type:   Motor Fuel Tax Project Improvement  

 

Request:  Approval of appropriation of Motor Fuel Tax Funds 

 

Project:  Electrical Engineering Design Services

 

Location:  Various Locations throughout Cook County in County Board Districts: Countywide

 

Section:  15-8TSDS-11-ES 

 

County Board District(s):  Countywide

 

Centerline Mileage:   N/A

 

Fiscal Impact:  $300,000.00 

 

Accounts:  Motor Fuel Tax Fund: (600-585 Account)

 

Summary:  The Department of Transportation and Highways respectfully submits for adoption a resolution appropriating funds for electrical engineering design services related to traffic signals at various locations throughout Cook County by an outside engineering consultant.  These services as proposed will consist of signal coordination and timing studies; preparation of traffic signal warrant studies and traffic signal design plans including installation, modernization and interconnect plans; conducting closed loop signal system monitoring; preparation of roadway lighting design plans and miscellaneous electrical systems (pump stations and maintenance yards) plans; review of traffic signal and roadway lighting plans; and assist with County’s Electrical and Mechanical Item Maintenance Contract.

 

These services are required by the Department to maintain the electrical and mechanical items on our roadway network to ensure public safety and traffic control. This appropriation is made in anticipation of a forthcoming contract to be submitted to your Honorable Body at a later date.

end