File #: 14-3157    Version: 1 Name: 3157 Supplemental Improvement Potter Road
Type: Supplemental Improvement Resolution (Highway) Status: Approved
File created: 5/12/2014 In control: Roads and Bridges Committee (Inactive. There is now a Transportation Committee)
On agenda: 6/18/2014 Final action: 7/23/2014
Title: PROPOSED SUPPLEMENTAL IMPROVEMENT RESOLUTION (TRANSPORTATION AND HIGHWAYS) Department: Transportation and Highways Project Type: Motor Fuel Tax Project Supplemental Improvement Request: Refer to the Committee of Roads and Bridges Project: Pavement widening, reconstruction, replacement of existing bridge and engineering costs for account closure. Location: Potter Road, Ballard to Evanston-Elgin (Golf) Road in the Cities of Des Plaines and Park Ridge and Unincorporated Maine Township Section: 85-W8140-01-RP County Board District: 9, 17 Centerline Mileage: 1.9 miles Fiscal Impact: $13,600,000.00 Accounts: Motor Fuel Tax Fund 600-585 Account Board Approved Date and Amount: 1/7/1985 $2,300,000.00 Increased Amount: $13,600,000.00 Total Adjusted Amount: $15,900,000.00 Summary: As the design plans progressed, the project became increasingly complicated by involvement with the Cities of Des Plaines and Park Ridge, the Town...
Indexes: (Inactive) JOHN YONAN, P.E., Superintendent, Department of Transportation and Highways
title
PROPOSED SUPPLEMENTAL IMPROVEMENT RESOLUTION (TRANSPORTATION AND HIGHWAYS)

Department: Transportation and Highways

Project Type: Motor Fuel Tax Project Supplemental Improvement

Request: Refer to the Committee of Roads and Bridges

Project: Pavement widening, reconstruction, replacement of existing bridge and engineering costs for account closure.

Location: Potter Road, Ballard to Evanston-Elgin (Golf) Road in the Cities of Des Plaines and Park Ridge and Unincorporated Maine Township

Section: 85-W8140-01-RP

County Board District: 9, 17

Centerline Mileage: 1.9 miles

Fiscal Impact: $13,600,000.00

Accounts: Motor Fuel Tax Fund 600-585 Account

Board Approved Date and Amount: 1/7/1985 $2,300,000.00

Increased Amount: $13,600,000.00

Total Adjusted Amount: $15,900,000.00

Summary: As the design plans progressed, the project became increasingly complicated by involvement with the Cities of Des Plaines and Park Ridge, the Township of Maine, and the Illinois Department of Transportation. This coordination caused lengthy delays to the project due to numerous requests for design plan changes. Further, there were many issues to resolve including utility conflicts, parking accommodations and easements/right-of-way acquisition.
Subsequently, the project scope was expanded to extend the southern limit of the improvement from Ballard Road to Dempster Street (0.26 miles). Further, similar improvements were added along intersecting Ballard Road (0.32 miles) and along intersecting Emerson Street (0.13 miles). Further, a portion of the scheduled Greenwood Avenue detour route was determined to be in too poor condition to be safely utilized as a detour route. Thus, Greenwood Avenue was improved from Carol Street to Davis Street (0.45 miles) by milling and resurfacing the existing pavement, including full-depth patching with curb and gutter repairs.
Additional funding was required due to the increased lengt...