File #: 14-3354    Version: 1 Name: C and P Kedzie
Type: Change in Plans and Extra Work (Highway) Status: Approved
File created: 5/22/2014 In control: Roads and Bridges Committee (Inactive. There is now a Transportation Committee)
On agenda: 6/18/2014 Final action: 7/23/2014
Title: PROPOSED CHANGE IN PLANS AND EXTRA WORK (TRANSPORTATION AND HIGHWAYS) Department: Transportation and Highways Other Part(ies): Path Construction Company, Arlington Heights, Illinois Action: Refer to the Committee of Roads and Bridges. Section: 12-W4612-06-BR Contract Number(s): 1355-12834 Location: Kedzie Ave. Bridge over N.I.R.C. near 141st Street in the Village of Robbins and City of Blue Island Location of project Board District: 5 Good(s) or Service(s): A new item is required for bar splicers to connect the reinforcement steel between stage 1 to stage 2 of bridge joint replacement Fiscal Impact: $203,532.40 increase Accounts: Motor Fuel Tax Fund Account 600-600 Summary: This change represents the difference between the estimated quantities and actual field quantities of work performed with additional quantities required for additional engineer's field office due to the extension of the contract, additional concrete superstructure...
Indexes: (Inactive) JOHN YONAN, P.E., Superintendent, Department of Transportation and Highways
title
PROPOSED CHANGE IN PLANS AND EXTRA WORK (TRANSPORTATION AND HIGHWAYS)
 
Department: Transportation and Highways
 
Other Part(ies):  Path Construction Company, Arlington Heights, Illinois  
 
Action:  Refer to the Committee of Roads and Bridges.
 
Section:  12-W4612-06-BR
 
Contract Number(s): 1355-12834
 
Location:  Kedzie Ave. Bridge over N.I.R.C. near 141st Street in the Village of Robbins and City of Blue Island Location of project
 
Board District:  5
 
Good(s) or Service(s):  A new item is required for bar splicers to connect the reinforcement steel between stage 1 to stage 2 of bridge joint replacement
 
Fiscal Impact:  $203,532.40 increase  
 
Accounts:  Motor Fuel Tax Fund Account 600-600
 
Summary:
This change represents the difference between the estimated quantities and actual field quantities of work performed with additional quantities required for additional engineer's field office due to the extension of the contract, additional concrete superstructure due to deeper existing concrete diaphragms and additional structural repair of concrete (depth equal or less than 5") required after inspection of the structure found additional unsound concrete. The quantities as shown on the contract documents were estimated for bidding purposes only.
 
A new item is required for bar splicers to connect the reinforcement steel between stage 1 to stage 2 of bridge joint replacement.
end