File #: 16-5582    Version: 1 Name: Traffic Engineering Services at various locations throughout Cook County
Type: Supplemental Improvement Resolution (Highway) Status: Approved
File created: 9/26/2016 In control: Board of Commissioners
On agenda: 10/26/2016 Final action: 10/26/2016
Title: PROPOSED SUPPLEMENTAL IMPROVEMENT RESOLUTION (TRANSPORTATION AND HIGHWAYS) Department: Transportation and Highways Project Type: Motor Fuel Tax Project Request: Approval of appropriation of Motor Fuel Tax Funds Project: Traffic Engineering Services at various locations throughout Cook County Location: Various Locations throughout Cook County Section: 13-TCIDS-11-ES County Board District: Countywide Centerline Mileage: N/A Fiscal Impact: $100,000.00 Accounts: 600-585 Account Board Approved Date and Amount: 12/4/2012, $300,000.00 Increased Amount: $100,000.00 Total Adjusted Amount: $400,000.00 Summary: Traffic counts and analysis, preparation of traffic volume projections, speed studies, traffic signal control warrant studies, all-way stop control warrant studies, Intersection Design Studies, crash analysis studies, permit review assistance, and other engineering tasks performed by an outside engineering consultant with supervision by County forces
Indexes: (Inactive) JOHN YONAN, P.E., Superintendent, Department of Transportation and Highways

title

PROPOSED SUPPLEMENTAL IMPROVEMENT RESOLUTION (TRANSPORTATION AND HIGHWAYS)

 

Department:  Transportation and Highways 

 

Project Type:  Motor Fuel Tax Project

 

Request:  Approval of appropriation of Motor Fuel Tax Funds

 

Project:  Traffic Engineering Services at various locations throughout Cook County

 

Location:  Various Locations throughout Cook County

 

Section:  13-TCIDS-11-ES

 

County Board District:  Countywide

 

Centerline Mileage:  N/A 

 

Fiscal Impact:  $100,000.00

 

Accounts:  600-585 Account

 

Board Approved Date and Amount:  12/4/2012, $300,000.00

 

Increased Amount:  $100,000.00

 

Total Adjusted Amount:  $400,000.00

 

Summary: Traffic counts and analysis, preparation of traffic volume projections, speed studies, traffic signal control warrant studies, all-way stop control warrant studies, Intersection Design Studies, crash analysis studies, permit review assistance, and other engineering tasks performed by an outside engineering consultant with supervision by County forces..

.end