The information and documents contained in this calendar include both current and past entries. In accordance with ADA Title II requirements mandating WCAG 2.1AA compliance for state and local government digital content by April 26, 2027, materials dated prior to this deadline may not meet current accessibility standards. If you require an accessible version of any material, please contact our office for assistance.
|
Legislation Details
|
File #:
|
17-1624
Version:
1
|
Name:
|
Design Engineering Services Appropriating Resolution #1
|
|
Type:
|
Appropriating Resolution (Highway)
|
Status:
|
Approved
|
|
On agenda:
|
3/8/2017
|
Final action:
|
3/8/2017
|
|
Title:
|
PROPOSED APPROPRIATING RESOLUTION (TRANSPORTATION AND HIGHWAYS)
Department: Transportation and Highways
Other Part(ies): N/A
Request: Approval
Good(s) or Services(s): Design Engineering Services
Location: Various Locations throughout Cook County
Section: 17-8DESV-00-EG
Fiscal Impact: $2,500,000.00
Accounts: 600-585 Account
Summary: Phase II and Part B design engineering services to be conducted by an outside consulting engineering firm for the preparation of roadway design plans and contract documents for the construction of County projects at various locations throughout Cook County. .end
|
|
Indexes:
|
(Inactive) JOHN YONAN, P.E., Superintendent, Department of Transportation and Highways
|
title
PROPOSED APPROPRIATING RESOLUTION (TRANSPORTATION AND HIGHWAYS)
Department: Transportation and Highways
Other Part(ies): N/A
Request: Approval
Good(s) or Services(s): Design Engineering Services
Location: Various Locations throughout Cook County
Section: 17-8DESV-00-EG
Fiscal Impact: $2,500,000.00
Accounts: 600-585 Account
Summary: Phase II and Part B design engineering services to be conducted by an outside consulting engineering firm for the preparation of roadway design plans and contract documents for the construction of County projects at various locations throughout Cook County. .end
|