File #: 17-3292    Version: 1 Name: Cottage Grove Avenue Emergency Culvert Repair Improvement Resolution
Type: Improvement Resolution (Highway) Status: Approved
File created: 5/9/2017 In control: Board of Commissioners
On agenda: 6/7/2017 Final action: 6/7/2017
Title: PROPOSED IMPROVEMENT RESOLUTION (TRANSPORTATION AND HIGHWAYS) Department: Transportation and Highways Project Type: Motor Fuel Tax Project Request: Approval of appropriation of Motor Fuel Tax Funds Project: Cottage Grove Avenue Emergency Culvert Repair Location: Village of Steger Section: 17-W5901-00-DR County Board District(s): 6 Centerline Mileage: N/A Fiscal Impact: $242,000.00 Accounts: 600-585 MFT Account Summary: The Department of Transportation and Highways respectfully request approval of the proposed improvement resolution. The emergency repair consists of an existing Corrugated Metal Pipe (CMP) culvert on Cottage Grove Avenue, 700 feet South of Mary Byrne Drive in the Village of Steger. The repair includes excavation and removal of the existing CMP, sub-base, installation of a new 48" RCP, backfill, Hot Mix Asphalt (HMA) pavement at excavated section, pavement markings, landscape restoration, traffic control and protection and other appurtenant wor...
Indexes: (Inactive) JOHN YONAN, P.E., Superintendent, Department of Transportation and Highways

title

PROPOSED IMPROVEMENT RESOLUTION (TRANSPORTATION AND HIGHWAYS)

 

Department: Transportation and Highways

 

Project Type:  Motor Fuel Tax Project 

 

Request: Approval of appropriation of Motor Fuel Tax Funds 

 

Project:  Cottage Grove Avenue Emergency Culvert Repair

 

Location:  Village of Steger

 

Section:  17-W5901-00-DR

 

County Board District(s):  6

 

Centerline Mileage:  N/A 

 

Fiscal Impact:  $242,000.00 

 

Accounts:  600-585 MFT Account

 

Summary: The Department of Transportation and Highways respectfully request approval of the proposed improvement resolution.  The emergency repair consists of an existing Corrugated Metal Pipe (CMP) culvert on Cottage Grove Avenue, 700 feet South of Mary Byrne Drive in the Village of Steger. The repair includes excavation and removal of the existing CMP, sub-base, installation of a new 48" RCP, backfill, Hot Mix Asphalt (HMA) pavement at excavated section, pavement markings, landscape restoration, traffic control and protection and other appurtenant work as required.