title
PROPOSED CHANGE IN PLANS AND EXTRA WORK (TRANSPORTATION AND HIGHWAYS)
Department: Transportation and Highways
Other Part(ies): Path Construction Company Inc., Arlington Heights, Illinois
Action: Refer to Roads and Bridges Committee - Proposed Change in Plans and Extra Work
Section: 12-W2515-03-BR
Contract Number(s): 1388-12930
IDOT Contract Number(s): N/A
Federal Project Number(s): N/A
Federal Job Number(s): N/A
Location:
104th Ave. at Cal-Sag Channel
Ridgeland Ave. at Cal-Sag Channel
Crawford Ave. at Cal-Channel
Francisco Ave. at Cal-Sag Channel
Board District: 5, 6 and 17
Good(s) or Service(s): The improvement included deck slab repair, removal and replacement of the existing strip seal expansion joint, cleaning and painting existing steel structures, structural repair of concrete, steel truss member repairs, removal and replacement of the deck in-fill areas and collateral and auxiliary work as needed to complete the project.
Fiscal Impact: $168,497.34 (decrease)
Accounts: 11566.1500.29150.560019
Summary: The Department of Transportation and Highways respectfully submits a change in plans and extra work on the above captioned project in the Villages of Alsip, Crestwood, Robbin, Worth and Cities of Blue Island and Palos Heights.
On 11/13/2013, your honorable Body awarded a contract to Path Construction Company Inc., Arlington Heights, Illinois for the aforesaid improvement to be completed in accordance with the plans and specifications.
The quantities as shown on the contract documents were estimated for bidding purposes only. This change represents the difference between the estimated quantities and actual field quantities of work performed with savings due to less quantities being required for deck repair for cathodic protection system and fiberglass grating.end