File #: 20-2340    Version: 1 Name: Christopher B. Burke Engineering, LTD, Rosemont, Illinois Contract Amendment for 1628-15722 CBBEL
Type: Contract Amendment Status: Approved
File created: 4/9/2020 In control: Board of Commissioners
On agenda: 5/21/2020 Final action: 5/21/2020
Title: PROPOSED CONTRACT AMENDMENT Department(s): Transportation and Highways Vendor: Christopher B. Burke Engineering, LTD, Rosemont, Illinois Request: Authorization for the Chief Procurement Officer to renew and increase contract Good(s) or Service(s): Electrical Engineering Design Services Original Contract Period: 7/10/2017 - 7/9/2020, with two (2), one (1), year renewal options Proposed Amendment Type: One-year renewal and $250,000.00 increase Proposed Contract Period: 7/10/2020-7/9/2021 Total Current Contract Amount Authority: $500,000.00 Original Approval (Board or Procurement): 6/28/2017, $500,000.00 Increase Requested: $250,000.00 Previous Board Increase(s): N/A Previous Chief Procurement Officer Increase(s): N/A Previous Board Renewals: N/A Previous Chief Procurement Officer Renewals: N/A Previous Board Extension(s): N/A Previous Chief Procurement Officer Extension(s): N/A Potential Fiscal Impact: FY 2020 $200,000.00, FY 2021 ...
Indexes: (Inactive) JOHN YONAN, P.E., Superintendent, Department of Transportation and Highways

title

PROPOSED CONTRACT AMENDMENT

 

Department(s):  Transportation and Highways 

 

Vendor:  Christopher B. Burke Engineering, LTD, Rosemont, Illinois    

 

Request: Authorization for the Chief Procurement Officer to renew and increase contract 

 

Good(s) or Service(s):  Electrical Engineering Design Services   

 

Original Contract Period: 7/10/2017 - 7/9/2020, with two (2), one (1), year renewal options

 

Proposed Amendment Type: One-year renewal and $250,000.00 increase

 

Proposed Contract Period:   7/10/2020-7/9/2021

 

Total Current Contract Amount Authority:  $500,000.00

 

Original Approval (Board or Procurement):  6/28/2017, $500,000.00

 

Increase Requested:  $250,000.00

 

Previous Board Increase(s):   N/A

 

Previous Chief Procurement Officer Increase(s):  N/A

 

Previous Board Renewals:   N/A

 

Previous Chief Procurement Officer Renewals:   N/A

 

Previous Board Extension(s):  N/A

 

Previous Chief Procurement Officer Extension(s):  N/A

 

Potential Fiscal Impact:  FY 2020 $200,000.00, FY 2021 $50,000.00

 

Accounts: Motor Fuel Tax: 11300.1500.29150.560019

 

Contract Number(s):  1628-15722

 

Concurrences:

The vendor has met the Minority- and Women-owned Business Enterprise Ordinance via direct participation.

 

The Chief Procurement Officer concurs.

 

Summary:  The Department of Transportation and Highways respectfully requests approval of the Proposed Contract Amendment between the County and Christopher B. Burke Engineering, LTD, in Rosemont, Illinois. This amendment provides for the renewal of the first of two one-year renewal options and an increase to the contract. This amendment provides for continual signal coordination and timing studies; preparation of traffic signal warrant studies and traffic signal design plans including installation, modernization, and interconnect plans; conducting closed loop signal system monitoring; preparation of roadway lighting design plans and miscellaneous electrical systems (pump stations and maintenance yards) plans; review of traffic signal and roadway lighting plans. 

 

The contract was awarded through a publicly advertised competitive Request for Qualification (RFQ) process in accordance with the Cook County Procurement Code. Christopher B. Burke Engineering, Ltd was awarded based on established evaluation criteria.

 

end