Meeting Name: Roads and Bridges Committee (Inactive. There is now a Transportation Committee) (inactive) Agenda status: Final
Meeting date/time: 6/9/2015 11:15 AM Minutes status: Final  
Meeting location: Cook County Building, Board Room, 118 North Clark Street, Chicago, Illinois
Published agenda: Not available Published minutes: Not available  
Meeting video:  
Attachments:
File #Ver.Agenda #NameTypeTitleMotionResultAction DetailsVideo
15-3762 1  Committee MinutesCOMMITTEE MINUTES Approval of the minutes from the meeting of 4/29/2015recommend for approvalPass Action details Video Video
15-2132 1 Cook County Public Way Regulatory OrdinanceOrdinancePROPOSED ORDINANCE AMENDMENT COOK COUNTY PUBLIC WAY REGULATORY ORDINANCE PROPOSED ORDINANCE AMENDMENT DIVISION 1. - GENERALLY Sec. 66-50. - Short title. This article shall be known as the "Cook County Public Way Regulatory Ordinance." Sec. 66-51. - Purposes. The purposes of this article are to: provide policies and procedures for the regulation of the use of County public ways for the construction, reconstruction, ownership, replacement, relocation, modification, maintenance, upgrading, operation and removal of facilities, including but not limited to public utility, pipeline, telecommunication, cable television, electric, gas, water, wastewater, petroleum product facilities, driveways, curb cuts, and other facilities; and provide for recovery of costs incurred by the County for licensing, permitting, inspecting, monitoring and regulating such uses of the public ways in order to provide for the public safety and interest. Notwithstanding the foregoing, the use of public ways under the jurisdiction or control of the County and located within the City of Chicago acceptPass Action details Video Video
15-2132 1 Cook County Public Way Regulatory OrdinanceOrdinancePROPOSED ORDINANCE AMENDMENT COOK COUNTY PUBLIC WAY REGULATORY ORDINANCE PROPOSED ORDINANCE AMENDMENT DIVISION 1. - GENERALLY Sec. 66-50. - Short title. This article shall be known as the "Cook County Public Way Regulatory Ordinance." Sec. 66-51. - Purposes. The purposes of this article are to: provide policies and procedures for the regulation of the use of County public ways for the construction, reconstruction, ownership, replacement, relocation, modification, maintenance, upgrading, operation and removal of facilities, including but not limited to public utility, pipeline, telecommunication, cable television, electric, gas, water, wastewater, petroleum product facilities, driveways, curb cuts, and other facilities; and provide for recovery of costs incurred by the County for licensing, permitting, inspecting, monitoring and regulating such uses of the public ways in order to provide for the public safety and interest. Notwithstanding the foregoing, the use of public ways under the jurisdiction or control of the County and located within the City of Chicago recommend for approval as substitutedPass Action details Video Video
15-3090 1 Bluff Road Bridge over Black Partridge Creek, Village of Lemont Robert Road Bridge over Stony Creek, Village of Richton Park 87th Street at Beech Street, Village of Willow Springs Steger Road Culvert at Butterfield Creek, City of Palos HillsSupplemental Improvement Resolution (Highway)PROPOSED SUPPLEMENTAL IMPROVEMENT RESOLUTION (TRANSPORTATION AND HIGHWAYS) Department: Transportation and Highways Project Type: Motor Fuel Tax Project Supplemental Improvement Request: Approval of a supplemental improvement resolution appropriating additional funds upon the recommendation of the Committee on Roads and Bridges. Project: Group 6-1998 This improvement, as proposed, consisted of bituminous concrete overlay removal and replacement, deck slab repair and scarification, guardrail terminal removal and replacement, channel excavation, placement of bituminous shoulders and stone riprap, installation of gabions, engineering and other necessary highway appurtenances. Location: Bluff Road Bridge over Black Partridge Creek, Village of Lemont Robert Road Bridge over Stony Creek, Village of Richton Park 87th Street at Beech Street, Village of Willow Springs Steger Road Culvert at Butterfield Creek, City of Palos Hills Section: 96-B4813-02-BR 97-W3216-02-BR 97-B4221-02-BR 98-C1227-04-BR County Board District: 6 and 17 Centerline recommend for approvalPass Action details Video Video
15-3119 1 Roberts Road, 86th to 79th Street in the Villages of Bridgeview and JusticeSupplemental Improvement Resolution (Highway)PROPOSED SUPPLEMENTAL IMPROVEMENT RESOLUTION (TRANSPORTATION AND HIGHWAYS) Department: Transportation and Highways Project Type: Motor Fuel Tax Project Request: Approval of a supplemental improvement resolution appropriating additional funds upon the recommendation of the Committee on Roads and Bridges. Project: Additional funding is needed due to scope expansion related to the construction of the mainline sewer. Location: Roberts Road, 86th to 79th Street in the Villages of Bridgeview and Justice Section: 14-W3219-01-DR County Board District: 6 Centerline Mileage: N/A Fiscal Impact: $800,000.00 Accounts: Motor Fuel Tax Fund: (600-585 Account) Board Approved Date and Amount: 9/10/2014, $3,700,000.00 Increased Amount: $800,000.00 Total Adjusted Amount: $4,300,000.00 Summary: The Department of Transportation and Highways respectfully submits for adoption, a supplemental improvement resolution appropriating additional funds for the improvements of Roberts Road from 86th Street to 79th Street in southern Cook Crecommend for approvalPass Action details Video Video
15-3165 1 BC Sign C and Plans 12-8SPAM-33-GMChange in Plans and Extra Work (Highway)PROPOSED CHANGE IN PLANS AND EXTRA WORK (TRANSPORTATION AND HIGHWAYS) Department: Transportation and Highways Other Part(ies): Western Remac, Inc., Woodridge Illinois Action: Approval of change in plans and extra work by the Board upon recommendation of the Committee of Roads and Bridges. Section: 12-8SPAM-33-GM Contract Number(s): N/A IDOT Contract Number(s): N/A Federal Project Number(s): N/A Federal Job Number(s): N/A Location: County Wide Board District: District of project Good(s) or Service(s): This maintenance contract consisted of furnishing, removing, relocating and maintaining existing and new sign panel assemblies and their appurtenances on various roads in Cook County. The quantities as shown on the contract documents were estimated for bidding purposes only. This change represents the difference between the estimated quantities and actual field quantities of work performed with savings due to less quantities being required for sign panel type AP, metal post type B, remove sign panel and nonuse of traffic investigatrecommend for approvalPass Action details Not available
15-3386 1 Connecting Cook County LRTPReportREPORT Department: Transportation and Highways Request: Refer to the Committee of Roads and Bridges Report Title: Connecting Cook County Long Range Transportation Plan Report Period: June 2013 to present Summary: Connecting Cook County is a Long Range Transportation Plan, which includes: (1) a Countywide transportation system inventory, (2) a forecast of socioeconomic and transportation data to establish future travel demand, (3) the identification and evaluation of transportation deficiencies, (4) a preferred scenario, (5) vision, goal and objective statements, and (6) recommendations for policies and strategies that address the transportation challenges facing Cook County. This update is provided in advance of releasing the plan for public comment this summer.recommend for receiving and filingPass Action details Video Video