|
Meeting date/time:
|
3/11/2026
10:30 AM
|
Minutes status:
|
Draft
|
|
|
Meeting location:
|
Cook County Building, Board Room,
118 North Clark Street, Chicago, Illinois Issued on: 3/5/2026
|
|
26-0940
| 1 | | | Committee Minutes | COMMITTEE MINUTES
Approval of the minutes from the meeting of 02/04/2026. | | |
Not available
|
Not available
|
|
26-0329
| 1 | | 2025 Safety Action Plan | Report | REPORT
Department: Department of Transportation and Highways
Report Title: Cook County Safety Action Plan
Report Period: 2025
Action: Refer to Committee
Summary: The Department of Transportation and Highway respectfully submits the Cook County Safety Action Plan (SAP). The SAP was developed by the Chicago Metropolitan Agency for Planning (CMAP) in partnership with the Cook County Department of Transportation and Highways (DoTH). The SAP is a roadmap for improving traffic safety by reducing the risk of death and serious injury on all public roads in Cook County, particularly for people walking and biking and for communities with disproportionately excessive crash rates. By combining community experiences and data analysis. The SAP identifies practical actions and innovative solutions to make roads within Cook County safer for all. Presentation to follow. | | |
Not available
|
Not available
|
|
26-0336
| 1 | | Grant Award Acceptance for Burnham Mutimodal Connector | Grant Award | PROPOSED GRANT AWARD
Department: Department of Transportation and Highways
Grantee: Cook County
Grantor: Illinois Department of Transportation
Request: Authorization to accept grant
Purpose: Cook County received $500,000.00 in 2024 Local Project Funding (LPF) grant funds to prepare detailed design engineering plans for the Burnham Multimodal Connector Bridge, a grade -separated pedestrian and bicyclist bridge over multiple railroad tracks in the Village of Burnham and City of Chicago
Grant Amount: $500,000.00
Grant Period: 5 years from date of execution of the funding agreement
Fiscal Impact: FY26 $0.00; FY27 $300,000.00; FY28 $200,000.00
Accounts: No cash match required. 11900.1500.54868.521536 (Grant Fund).
Concurrences:
The Budget Department has received all requisite documents and determined the fiscal impact on Cook County, if any.
Summary: The Department of Transportation and Highways respectfully requests approval of the proposed grant award acceptance. This $500,000.00 grant award from the Illinois Department of Transpo | | |
Not available
|
Not available
|
|
26-0337
| 1 | | Grant Award Acceptance for Touhy Avenue: Elmhurst Road to Mt. Prospect Avenue | Grant Award | PROPOSED GRANT AWARD
Department: Department of Transportation and Highways
Grantee: Cook County
Grantor: Illinois Department of Transportation
Request: Authorization to accept grant
Purpose: The Department is the recipient of $5,000,000.00 in 2024 Local Project Funding (LPF) grant funds for the improvement of Touhy Avenue from Elmhurst Road to Mt. Prospect Road in the Village of Elk Grove Village, City of Des Plaines and City of Chicago and in coordination with the Illinois Tollway and the municipalities.
Grant Amount: $5,000,000.00
Grant Period: 7 years from date of execution of the funding agreement
Fiscal Impact: FY26 $0.00; FY27 $2,000,000.00; FY28 $3,000,000.00
Accounts: No cash match required. 11900.1500.54869.521536 (Grant Fund).
Concurrences:
The Budget Department has received all requisite documents and determined the fiscal impact on Cook County, if any.
Summary: The Department of Transportation and Highways respectfully requests approval of the proposed grant award acceptance. This grant award of $5,000,000.00 suppor | | |
Not available
|
Not available
|
|
26-0338
| 1 | | Grant Award Acceptance for Central Des Plaines River Trail | Grant Award | PROPOSED GRANT AWARD
Department: Department of Transportation and Highways
Grantee: Cook County
Grantor: Illinois Department of Transportation
Request: Authorization to accept grant
Purpose: The Department of Transportation and Highways is the recipient of $800,000.00 in Transportation Alternatives Program - Local (TAP-L) for the preliminary and environmental (Phase I) study to extend the Des Plaines River Trail between the CTA Forest Park Blue Line station and the Salt Creek Trail near 26th Street in the Village of North Riverside. The scope of the project includes identifying connections to the Illinois Prairie Path and the Salt Creek Trail, and the improvements will extend through the Villages of Forest Park, Maywood, North Riverside, as well as unincorporated Proviso Township.
Grant Amount: $800,000.00
Grant Period: 10/1/2026 - 9/30/2028
Fiscal Impact: FY26 $0.00; FY27 $400,000.00; FY28 $400,000.00
Accounts: No cash match required. 11900.1500.54870.521536 (Grant Fund).
Concurrences:
The Budget Department has received all requisi | | |
Not available
|
Not available
|
|
26-0454
| 1 | | Grant Award Acceptance for Touhy Avenue -CMAQ Section number 15-34117-01-RP | Grant Award | PROPOSED GRANT AWARD
Department: Department of Transportation and Highways
Grantee: Cook County
Grantor: Illinois Department of Transportation
Request: Authorization to accept grant
Purpose: The Department is the recipient of $6,441,650.00 in Congestion Mitigation and Air Quality Improvement (CMAQ) grant funds for the improvement of Touhy Avenue from Elmhurst Road to Mt. Prospect Road in the Village of Elk Grove Village, City of Des Plaines and City of Chicago and in coordination with the Illinois Tollway and the municipalities.
Grant Amount: $6,441,650.00
Grant Period: 7 years from date of execution of the funding agreement
Fiscal Impact: FY26 $0.00; FY27 $3,000,000.00; FY28 $3,441,650.00
Accounts: No cash match required. 11900.1500.53665.521536 (Grant Fund).
Concurrences:
The Budget Department has received all requisite documents and determined the fiscal impact on Cook County, if any.
Summary: The Department of Transportation and Highways respectfully requests approval of the proposed grant award acceptance. This grant aw | | |
Not available
|
Not available
|
|
26-0407
| 1 | | Invest in Cook 2025 IGA with Village of Bedford Park | Intergovernmental Agreement (Highway) | PROPOSED INTERGOVERNMENTAL AGREEMENT (TRANSPORTATION AND HIGHWAYS)
Department: Transportation and Highways
Other Part(ies): Village of Bedford Park, Illinois
Request: Approval of Proposed Intergovernmental Agreement
Goods or Services: Construction and Construction Engineering
Location: Village of Bedford Park, Illinois
Section: 25-IICBP-00-SW
Centerline Mileage: N/A
County Board District: 6, 16
Agreement Number(s): N/A
Agreement Period: One-time Agreement
Fiscal Impact: $250,000.00
Accounts: Motor Fuel Tax Fund: 11300.1500.29150.521536
Summary: The Department of Transportation and Highways respectfully requests approval of the proposed Intergovernmental Agreement between the County and the Village of Bedford Park. The Village will be the lead agency for construction and construction engineering for pedestrian sidewalk along the west side of Archer Road, extending from 71st Street to the firehouse located at Roberts Road. The County will reimburse the Village for its share of construction and construction engineering costs. | | |
Not available
|
Not available
|
|
26-0493
| 1 | | Improvement Resolution for Lower Des Plaines River Trail Extension Study | Improvement Resolution (Highway) | PROPOSED IMPROVEMENT RESOLUTION (TRANSPORTATION AND HIGHWAYS)
Department: Transportation and Highways
Project Type: Motor Fuel Tax Project
Request: Approval of appropriation of Motor Fuel Tax Funds
Project: Lower Des Plaines River Trail Study Extension
Location: Village of Brookfield, Village of La Grange Park, Village of Lyons, Village of Riverside, Riverside Township, Illinois and the Forest Preserve of Cook County
Section: 24-LDPRT-00-BT
County Board District(s): 16, 17
Centerline Mileage: N/A
Fiscal Impact: $300,000.00
Accounts: Motor Fuel Tax Fund: 11300.1500.29150.521536
Summary: The Department of Transportation and Highways respectfully requests approval of the proposed improvement resolution for the extension of the Des Plaines River Trail in the Villages of Brookfield, LaGrange Park, Lyons, and Riverside, Riverside Township, and the Forest Preserves of Cook County in Cook County. Work includes preliminary engineering and an environmental (Phase I) study. | | |
Not available
|
Not available
|
|
26-0501
| 1 | | Professional Services Contract- Preliminary Engineering Services Various Various – A (Contract no. 2561-03172A) | Contract (Highway) | PROPOSED CONTRACT (TRANSPORTATION AND HIGHWAYS)
Department(s): Transportation and Highways
Vendor: HR Green, Inc., Aurora, Illinois
Request: Authorization for the Chief Procurement Officer to enter into and execute contract.
Good(s) or Service(s): Preliminary Engineering Services and Preparation of Phase I Studies
Location: Countywide
Section: 25-6PESV-03-ES
Contract Value: $3,500,000.00
Contract period: 4/1/2026 - 3/31/2031
Contract Utilization: The Vendor has met the Minority- and Women-Owned Business Enterprise Ordinance Via: Direct Participation.
Potential Fiscal Year Budget Impact: FY 2026 $500,000.00; FY 2027 $700,000.00; FY 2028 $700,000.00; FY 2029 $700,000.00; FY 2030 $700,000.00; FY 2031 $200,000.00
Accounts: Motor Fuel Tax Funds: 11300.1500.29150.521536
Contract Number(s): 2561-03172A
Summary: The Department of Transportation and Highways respectfully request the approval of the proposed Contract between Cook County and HR Green, Inc., of Aurora, Illinois.
This is a task order-based contract under which the vendor wi | | |
Not available
|
Not available
|
|
26-0502
| 1 | | Professional Services Contract - Preliminary Engineering Services Various Various – B Contract co. number 2561-03172B | Contract (Highway) | PROPOSED CONTRACT (TRANSPORTATION AND HIGHWAYS)
Department(s): Transportation and Highways
Vendor: Kimley-Horn and Associates, Inc., Chicago, Illinois
Request: Authorization for the Chief Procurement Officer to enter into and execute contract.
Good(s) or Service(s): Preliminary Engineering Services and Preparation of Phase I Studies
Location: Countywide
Section: 25-6PESV-04-ES
Contract Value: $3,500,000.00
Contract period: 4/1/2026 - 3/31/2031
Contract Utilization: The Vendor has met the Minority- and Women-Owned Business Enterprise Ordinance Via: Direct Participation.
Potential Fiscal Year Budget Impact: FY 2026 $500,000.00; FY 2027 $700,000.00; FY 2028 $700,000.00; FY 2029 $700,000.00; FY 2030 $700,000.00; FY 2031 $200,000.00
Accounts: Motor Fuel Tax Funds: 11300.1500.29150.521536
Contract Number(s): 2561-03172B
Summary: The Department of Transportation and Highways respectfully request the approval of the proposed Contract between Cook County and Kimley-Horn & Associates, Inc., of Chicago, Illinois.
This is a task order-base | | |
Not available
|
Not available
|
|
26-0503
| 1 | | Professional Services Contract
- Preliminary Engineering Services Various Various – C Contract no. 2561-03172C | Contract (Highway) | PROPOSED CONTRACT (TRANSPORTATION AND HIGHWAYS)
Department(s): Transportation and Highways
Vendor: Peralte-Clark, LLC, Arlington Heights, Illinois
Request: Authorization for the Chief Procurement Officer to enter into and execute contract.
Good(s) or Service(s): Preliminary Engineering Services and Preparation of Phase I Studies
Location: Countywide
Section: 25-6PESV-05-ES
Contract Value: $3,500,000.00
Contract period: 4/1/2026 - 3/31/2031
Contract Utilization: The Vendor has met the Minority- and Women-Owned Business Enterprise Ordinance Via: Direct Participation. The Prime Vendor is a Certified MBE.
Potential Fiscal Year Budget Impact: FY 2026 $500,000.00; FY 2027 $700,000.00; FY 2028 $700,000.00; FY 2029 $700,000.00; FY 2030 $700,000.00; FY 2031 $200,000.00
Accounts: Motor Fuel Tax Funds: 11300.1500.29150.521536
Contract Number(s): 2561-03172C
Summary: The Department of Transportation and Highways respectfully request the approval of the proposed Contract between Cook County and Peralte-Clark, LLC, of Arlington Heights, Illinoi | | |
Not available
|
Not available
|
|
26-0505
| 1 | | Professional Services Contract- Preliminary Engineering Services and Preparation of Phase I Study (Contract no. 2405-09261C) | Contract (Highway) | PROPOSED CONTRACT (TRANSPORTATION AND HIGHWAYS)
Department(s): Transportation and Highways
Vendor: GFT Infrastructure, Inc., Chicago, Illinois
Request: Authorization for the Chief Procurement Officer to enter into and execute contract.
Good(s) or Service(s): Professional Engineering Services and Preparation of Phase I Study
Location: Village of Riverside, Illinois
Section: 24-W8825-00-BR
Contract Value: $1,511,824.00
Contract period: 4/1/2026 - 3/31/2030
Contract Utilization: The Vendor has met the Minority - and Women-Owned Business Enterprise Ordinance Via: Direct Participation.
Potential Fiscal Year Budget Impact: FY 2026 $600,000.00; FY 2027 $600,000.00; FY 2028 $311,824.00
Accounts: Motor Fuel Tax: 11300.1500.29150.560019
Contract Number(s): 2405-09261C
Summary: The Department of Transportation and Highways respectfully request the approval of the proposed Contract between Cook County and GFT Infrastructure, Inc., Chicago, Illinois.
Under this contract, GFT Infrastructure, Inc. will prepare a preliminary engineering and envi | | |
Not available
|
Not available
|
|
26-0521
| 1 | | Improvement Resolution- Barry Point Road Bridge over the Des Plaines River | Improvement Resolution (Highway) | PROPOSED IMPROVEMENT RESOLUTION (TRANSPORTATION AND HIGHWAYS)
Department: Transportation and Highways
Project Type: Motor Fuel Tax Project
Request: Approval of appropriation of Motor Fuel Tax Funds
Project: Barrypoint Road Bridge over the Des Plaines River
Location: Village of Riverside, Illinois
Section: 24-W8825-00-BR
County Board District(s): 16
Centerline Mileage: N/A
Fiscal Impact: $1,900,000.00
Accounts: Motor Fuel Tax Fund: 11300.1500.29150.560019
Summary: The Department of Transportation and Highways respectfully requests approval of the proposed improvement resolution for the Barrypoint Road Bridge over the Des Plaines River Project which includes preliminary engineering for the removal and replacement of the Barrypoint Road Bridge in the Village of Riverside in Cook County. | | |
Not available
|
Not available
|
|
26-0522
| 1 | | Improvement Resolution- Lake-Cook Road Bridge Deck Replacements | Improvement Resolution (Highway) | PROPOSED IMPROVEMENT RESOLUTION (TRANSPORTATION AND HIGHWAYS)
Department: Transportation and Highways
Project Type: Motor Fuel Tax Project
Request: Approval of appropriation of Motor Fuel Tax Funds
Project: Lake-Cook Road Bridge Deck Replacements
Location: Village of Deerfield, Village of Northbrook, and the Village of Palatine, Illinois
Section: 24-A5011-08-BR
County Board District(s): 14
Centerline Mileage: N/A
Fiscal Impact: $1,500,000.00 (FY26 = $500,000.00; FY27 = $500,000.00; FY28 = $500,000.00)
Accounts: Motor Fuel Tax Fund: 11300.1500.29150.560019
Summary: The Department of Transportation and Highways respectfully requests approval of the proposed improvement resolution for the Lake-Cook Road Bridge Deck Replacements which includes preliminary engineering for the replacement of concrete bridge decks, in the Villages of Deerfield, Northbrook, and Palatine in Cook County. | | |
Not available
|
Not available
|
|
|