19-5708
| 1 | | | Committee Minutes | COMMITTEE MINUTES
Approval of the minutes from the meeting of 5/22/2019 | approve | Pass |
Action details
|
Video
|
19-4276
| 1 | | Western Remac Inc., Woodridge, Illinois Change in Plans for the Sign Panel Assembly Maintenance | Change in Plans and Extra Work (Highway) | PROPOSED CHANGE IN PLANS AND EXTRA WORK (TRANSPORTATION AND HIGHWAYS)
Department: Transportation and Highways
Other Part(ies): Western Remac Inc., Woodridge, Illinois
Action: Refer to Transportation Committee
Section: 13-8SPAM-34-GM, 15-8SPAM-35-GM, 16-8SPAM-00-GM, and 17-8SPAM-00-GM
Contract Number(s): 13-53-054
IDOT Contract Number(s): N/A
Federal Project Number(s): N/A
Federal Job Number(s): N/A
Location: Countywide
Board District: Countywide
Good(s) or Service(s): Fabrication, Installation, Removal, Relocation and Maintenance
Fiscal Impact: $441,484.07 decrease
Accounts: Motor Fuel Tax: 11300.1500.29150.540370
Summary: The Department of Transportation and Highways respectfully submits the Proposed Change in Plans due to a savings regarding this contract. This contract is for the fabrication, installation, removal, relocation and maintenance of existing as well as new sign panel assemblies and their appurtenances located along various roads on the Cook County Highway System. The decreases are attributed to the difference be | recommend for approval | Pass |
Action details
|
Video
|
19-4858
| 1 | | Change in Plans for Crawford Avenue from Devon to Oakton | Change in Plans and Extra Work (Highway) | PROPOSED CHANGE IN PLANS AND EXTRA WORK (TRANSPORTATION AND HIGHWAYS)
Department: Transportation and Highways
Other Part(ies): Capitol Cement Company, Inc., Chicago, Illinois
Action: Refer to Transportation Committee
Section: 08-W4337-03-PV
Contract Number(s): 1388-13051
IDOT Contract Number(s): N/A
Federal Project Number(s): N/A
Federal Job Number(s): N/A
Location: Crawford Avenue-Devon Avenue to Oakton Street, Villages of Skokie and Lincolnwood, Illinois
Board District: 13
Good(s) or Service(s): Construction Services
Fiscal Impact: ($30,749.24) Decrease
Accounts: Motor Fuel Tax: 11300.1500.29150.560019
Concurrences:
N/A
Summary:
The Department of Transportation and Highways respectfully submits a change in plans and extra work of the above captioned project in the Villages of Skokie and Lincolnwood.
On 2/19/2014 your honorable Body awarded a contract to Capitol Cement Company, Inc., Chicago, Illinois for the aforesaid improvement to be completed in accordance with the plans and specifications.
The quantities as | recommend for approval | Pass |
Action details
|
Video
|
19-5211
| 1 | | Fair Transit for South Cook County Pilot | Report | REPORT
Department: Department of Transportation and Highways
Report Title: Fair Transit for South Cook County Pilot
Action: Refer to Transportation Committee
Report Period: N/A
Summary: The Department of Transportation and Highways respectfully requests that the Fair Transit for South Cook County Pilot be referred to Committee for further discussion. The South Cook Mobility Study was undertaken by the Department and was to determine how to put the region’s existing transit assist to more effective use. The study’s objective was to implement changes to fare policy, modest service improvements, and improve coordination between Metra, CTA, and Pace. The study builds upon the Department’s previous efforts to bring increased connectivity and mobility to residents of South Cook County while reducing disparities in access to employment. | recommend for receiving and filing | Pass |
Action details
|
Video
|