13-1234
| 2 | | Schaumburg Road, Barrington Road to Roselle Road in the Villages of Hoffman Estates and Schaumburg | Change in Plans and Extra Work (Highway) | PROPOSED CHANGE IN PLANS AND EXTRA WORK
Department: Department of Transportation and Highways
Other Part(ies): N/A
Action: Refer to Roads and Bridge Committee
Section: 12-A6607-04-RP
Location: Schaumburg Road, Barrington Road to Roselle Road in the Villages of Hoffman Estates and Schaumburg
Board District: #15
Good(s) or Service(s): The quantities as shown on the contract documents were estimated for bidding purposes only. This change represents the difference between the estimated quantities and actual field quantities of work performed with additional quantities required to repair the deteriorated centerline joint for both eastbound and westbound mainline pavement.
Fiscal Impact: $325,600.00 Addition
Accounts: Motor Fuel Tax Fund: 600-600
Legislative History: 9/11/13 Board of Commissioners referred to the Roads and Bridges Committee (Board Agenda Item #32) | recommend for approval | Pass |
Action details
|
Video
|
13-1301
| 2 | | Group 3-2012, Euclid Avenue- Elmhurst Road (IL.-83) to Wolf Road, Euclid Avenue- over Illinois Route 53 in the Village of Mount Prospect, City of Prospect Heights, City of Rolling Meadows, Villages of Palatine and Wheeling | Change in Plans and Extra Work (Highway) | PROPOSED CHANGE IN PLANS AND EXTRA WORK
Department: Department of Transportation and Highways
Other Part(ies): N/A
Action: Refer to Committee on Roads and Bridges
Section: 11-A5916-06-RS
Location: Group 3-2012. Euclid Avenue, Elmhurst Road (IL-83) to Wolf Road; and Euclid Avenue over Illinois Route 53 in the Cities of Prospect Heights and Rolling Meadows and the Villages of Mount Prospect, Palatine and Wheeling.
Board District: County Board #14 & #17
Good(s) or Service(s): The quantities as shown on the contract documents were estimated for bidding purposes only. This change represents the difference between the estimated quantities and actual field quantities. New items, seeding & blanket and top soil were used in lieu of the originally proposed sodding, per field conditions.
Fiscal Impact: $11,439.00 (Addition)
Accounts: 600-600
Summary: Adjustment of Quantities and New Items.
Legislative History: 9/11/13 Board of Commissioners referred to the Roads and Bridges Committee (Board Agenda Item #32) | recommend for approval | Pass |
Action details
|
Not available
|
13-1373
| 2 | | West Bartlett Road- Spitzer Road to IL. Route 59; Munger/Naperville Road- DuPage County Line to West Bartlett in the Village of Bartlett, the City of Elgin and unincorporated Hanover Township | Change in Plans and Extra Work (Highway) | PROPOSED CHANGE IN PLANS AND EXTRA WORK (TRANSPORTATION AND HIGHWAYS)
Department:
Department of Transportation and Highways
Other Part(ies):
N/A
Action:
Refer to Committee on Roads and Bridges
Section:
00-B1003-05-RP
Location:
West Bartlett Road- Spitzer Road to IL. Route 59; Munger/Naperville Road- DuPage County Line to West Bartlett in the Village of Bartlett, the City of Elgin and unincorporated Hanover Township
Board District:
Cook County Board District #15
Good(s) or Service(s):
The quantities as shown on the contract documents were estimated for bidding purposes only. This change represents the difference between the estimated quantities and actual field quantities of work performed with additional quantities for tree planting. Adjustment of Quantities
Fiscal Impact:
$10,800.00 (Addition).
Accounts:
Motor Fuel Tax Fund: (600-600 Account) | recommend for approval | Pass |
Action details
|
Not available
|
13-1377
| 4 | | Bartlett Road, Lake Street to Golf Road | Change in Plans and Extra Work (Highway) | PROPOSED CHANGE IN PLANS AND EXTRA WORK
Department: Transportation and Highways
Other Part(ies): N/A
Action: Refer to Committee Roads and Bridges
Section: 11-V4738-02-RP
Location: (Contract No.: 11-28-1860) Bartlett Road, Lake Street to Golf Road in the Villages of Bartlett, Hoffman Estates and Streamwood
Board District: 15
Good(s) or Service(s): Adjustment of Quantities. The quantities as shown on the contract documents were estimated for bidding purposes only. This change represents the difference between the estimated quantities and actual field quantities with additional time required for engineer’s field office, which was used to complete punch list items, field measurements and calculation of final quantities Final.
Fiscal Impact: $15,236.00 (Addition).
Accounts: 600-600
Legislative History: 9/11/13 Board of Commissioners referred to the Roads and Bridges Committee (Board Agenda Item #32) | recommend for approval | Pass |
Action details
|
Not available
|
13-1378
| 2 | | Joe Orr Road- Relocated, East of Stony Island Avenue to Torrence Avenue in the Village of Lynwood and Ford Heights | Change in Plans and Extra Work (Highway) | PROPOSED CHANGE IN PLANS AND EXTRA WORK
Department: Department of Transportation and Highways
Other Part(ies): N/A
Action: Refer to Committee on Roads and Bridges
Section: 09-B6736-03-RP; Federal Project. No.: M-9003 (741); Federal Job No.: C-91-184-11; County Contract No.: 11-28-160; IDOT Contract No.: 10217
Location: Joe Orr Road Relocated, east of Stony Island Avenue to Torrence Avenue in the Village of Lynwood and Ford Heights
Board District: County Board District #6
Good(s) or Service(s): The quantities as shown on the contract documents were estimated for bidding purposes only. This change represents the difference between the estimated quantities and actual field quantities of work performed with new items to reflect a savings to the County due to the contractors use of Hot-Mix Asphalt mixes containing more recycled material, which is more economical to produce but still meets all QC/QA quality assurance criteria.
Fiscal Impact: $10,088.81(Deduction).
Accounts: 600-600
Legislative History: 9/11/13 Board of Commissioners referred to the | recommend for approval | Pass |
Action details
|
Not available
|
13-1381
| 2 | | Wentworth Avenue; Glenwood-Lansing Road to Ridge Road in the Village of Lansing in Bloom and Thornton Townships | Change in Plans and Extra Work (Highway) | PROPOSED CHANGE IN PLANS AND EXTRA WORK
Department: Department of Transportation and Highways
Other Part(ies): N/A
Action: Refer to Committee on Roads and Bridges
Section: 95-W6606-01-RP
Location: Wentworth Avenue, Glenwood-Lansing Road to Ridge Road in the Village of Lansing in Bloom and Thornton Townships.
Board District: County Board District #6
Good(s) or Service(s): Adjustment of Quantities and New Items. The quantities as shown on the contract documents were estimated for bidding purposes only. This change represents the difference between the estimated quantities and actual field quantities of work performed with earth excavation to address conflict with existing utilities.New items were required to repair and relocate existing utilities due to conflicts.
Fiscal Impact: $103,328.33(Addition)
Accounts: 600-600
Legislative History: 9/11/13 Board of Commissioners referred to the Roads and Bridges committee (Board Agenda Item #32) | recommend for approval | Pass |
Action details
|
Not available
|